I
H
x 2
I
H
x 2
11
H
x 4
C
C
o
C
C
C
Top View
q
D
q
D
q
D
q
D
q
D
q
D
q
D
q
D
q
D
q
D
Secure the
panels to the
base
L
L
g
In line with
the apex
Overhang
at the front
14
13
E
Ensure
screws locate
in to the
framing and
are not
protruding.
Ensure
screws heads
are flush with
the bracket
Flush with
the
front of the
door framing
Please ensure
that
all the screws
locate into the
bearers
underneath
12