background image

SAGE RAISED PLAYHOUSE

REQUIRED TOOLS: (NOT SUPPLIED)

Issue 0218

PHTPA44ST

Instruction Reference

Important :

Assembly of this
product requires

a minimum of two

adults only

.

Warning. Only for domestic use

Biocidal Product Regulation (EU 528/2012) Article 58 Information

This article contains timber treated with Tanalith, incorporating biocidal
products to give protection against wood destroying insects & wood rotting
fungi.

Contains:

Basic copper carbonate (Copper (II) carbonate – Copper (II)

hydroxide (1:1)), Boric acid, Benzalkonium chloride.

Wear gloves when handling freshly treated wood. Avoid breathing dust when
cutting treated or untreated wood. Dispose of off-cuts responsibly – do not
burn.

IMPORTANT, RETAIN FOR FUTURE REFERENCE; READ

CAREFULLY

- This

is pressure

to ensure longevity of all timber

building

treated

components and to protect against rot. This may leave a colour
difference on some parts that will even out as the moisture content
stabilises This will not need additional treatment.

.

- Timber is a natural material. It will shrink and swell as a result of
varying moisture content.
- Please keep all plastic bags and small parts away from children
- This product must be built on a level base and at least two metres
away from any structure or obstruction.

Warnings

-This product is for outdoor use only.
-This product is intended for use by children of up to age 10 years.
-Only for domestic use

Technical Help line:

7777 089

8.30 am and 5.00 pm  Monday to

0333

Friday.

In line with your statutory rights, please check all parts prior to
assembly, as assembly of damaged parts may be deemed to be
acceptance and this may affect the remedies you are entitled to.
The manufacturer does not accept any liability for injury or damage to
property caused by this product not being constructed in accordance
with our instructions or being altered in anyway.

Slipping, Tripping

& Falling

TAPE MEASURE

SHARP KNIFE

DRILL/POZI DRIVE

SCREWDRIVER

Must

Pre-drill

SPIRIT LEVEL

HAMMER

Fixing Pack (PHTPA44STFP)

Not to Scale

3.0 x 35mm Screw Qty 38

3.0 x 20mm Screw Qty 22

10mm Clout Nail Qty 60

I

B

J

Magnetic

Catch and Plate

Qty 2

Hinge Qty 4

Maintenance:

- Make sure that there are no sharp edges or nails / screws protruding inside and out.
- Make sure that any sharp edges are sanded before use.
- Shake felt to remove any loose grit, prior to assembly of playhouse.

Regularly check

- All fixings are tight.
- All parts for evidence of deterioration and replace in accordance with the
manufacturers instructions.
- There are no splits, splinters, or protruding nails / screws prior to each use.
- The platform is level.

3.5 x 50mm Screw Qty 68

3.0 x 25mm Screw Qty 53

C

D

E

G

H

4.0 x 70mm Screw Qty 48

A

5.0 x 100mm Screw Qty 4

F

Corner Bracket Qty 2

STEP LADDER

3.5 x 60mm Screw Qty 8

L

K

3.5 x 40mm Screw Qty 28

Содержание SAGE RAISED PLAYHOUSE

Страница 1: ...tdoor use only This product is intended for use by children of up to age 10 years Only for domestic use Technical Help line 7777 089 8 30 am and 5 00 pm Monday to 0333 Friday In line with your statuto...

Страница 2: ...52 952mm LONG Qty 2 SAGRAIL6 BRACE390 Qty 8 SAGRAIL11 POST1630 1630mm LONG Qty 2 BASEMSFP Qty 4 v PARTS LIST w STRINGLH PDSTEP Qty 3 x DB9519 PT 1712 DECK BOARD 1712mm Qty 2 DB9519 PT 1780 DECK BOARD...

Страница 3: ...re not protruding q K x 2 Ensure screws locate in to the framing and are not protruding C s r a1 c1 b1 y z Flush Place all of the boards before fixing Make sure that all the gaps are even and that the...

Страница 4: ...n as a measuring stick for positioning your panels correctly Framework Flush Do not secure the panels to the floor at this point q D q D q D q D q D q D q D q D q D 4 6 a Window Assembly Flush a c e k...

Страница 5: ...25mm 395mm floor level 6mm 395mm J G x 3 9 15mm 13mm 13mm 13mm Attention Gaps must be at least 13mm G x 2 10 h Flush with the inside of the door framing Forest Garden Ltd Unit 288 Hartlebury Trading...

Страница 6: ...anels to the base L L g In line with the apex Overhang at the front 14 13 E Ensure screws locate in to the framing and are not protruding Ensure screws heads are flush with the bracket Flush with the...

Страница 7: ...18 17 v W X D m D Ensure screws locate in to the ends of the rafters C C C C C Ensure screws locate in to the framing and are not protruding B x 2 q Attention Take care when cutting or trimming roof f...

Страница 8: ...Ground Level f G x 4 B x 2 x 4 B Underneath 19 20 Spikes must be flush to the post and and buried in the ground at least 150mm...

Отзывы: