Forest Garden Ltd, Unit 288 Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB
Biocidal Product Regulation (EU 528/2012) Article 58 Information
This article contains timber treated with Celcure AC-500, incorporating biocidal products to give p
rotection against wood destroying insects & wood rotting fungi
.
Contains:
Basic copper carbonate (Copper (II) carbonate – Copper (II) hydroxide (1:1)), Boric acid, Benzalkonium chloride.
Wear gloves when handling freshly treated wood. Avoid breathing dust when cutting treated or untreated wood. Dispose of off-cuts responsibly – do not burn.
8
Lift the roof sections into place making sure that they are in line with the apex and
the front and back panels of the shed.
Fix the roof in place using 30mm nails spaced in approximately 300mm intervals.
(Make sure the nails locate into the framework of the panels)
9
7
10
5
Unroll the felt and cut it into three equal lengths. Place a section on each eaves so that
there is a 50mm overhang on each edge as shown. Fix this to the roof using felt nails
spaced in 150mm intervals. Cut and fold the corners securing with a single felt nail for each.
Place the remaining section as shown making sure that the it overlaps the others. Again
secure each sheet in place using felt nails spaced in 150mm intervals.
K
I
Fix the ridge plate from inside the shed so that it bridges the two battens at the apex
together. Fix using 2 x 25mm screws
Maintenance.
Regularly check that all fixings are secure.
The roofing felt has no holes or tears.
There are no splits in the wood and any large splinters removed.
Attention
Take care when
cutting and
trimming the roof
felt.
Place the window from the outside so that the lip sits on the bottom board as shown.
Place the plastic strips around the window so that one side butts up against the cladding.
Fix the strips and the window in place using 2 x security screws for each strip and one for the top of
the window.
N
Using scissors (carefully) cut
the plastic strips size.
Attention:
Take care when placing
the screws. These can
not be backed out.
Lip
Board
H
6
Fix a Z’ bracket to
each end of the
1436mm battens
using a 25mm
screw for each.
A
O
15mm Offset
M
G
O
45mm Offset
G
pencil line
Nailing through the roof sheet (G) in to the battens. Position the battens as shown.
1.The 1436mm batten (M) should be flush on all sides.
2.Place a 1352mm batten (O) so that it is offset 45mm on either side and has a 15mm
offset on the long side.
3.Place another 1352mm batten (O) in between, again with a 45mm offset on both sides.
Fix each batten in place using 30mm nails spaced in 300mm intervals.
B
Place the barge boards against the front and back of the shed. Make sure that these
are in line with the roof sheet and meet at the apex. Fix each in place using 3 x 40mm
screws.
Place the finial over the top of where the barge boards meet and fix it in place using 2
x 30mm screws.
Before fixing the Hasp to the door make sure that it is in line with the framing on the
reverse and is positioned so that it will close over the Staple. Fix this in place using 3 x
25mm screws.
Position the Staple opposite, again making sure that it is in line with the framing behind
and fix it in place using 2 x 25mm screws.