![Forest garden Overlap Apex Shed 4x3 Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/forest-garden/overlap-apex-shed-4x3/overlap-apex-shed-4x3_quick-start-manual_2319325002.webp)
6
Forest Garden Ltd, Unit 288 Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB
Maintenance.
Regularly check all fixings are secure and the roofing felt has no holes or tears.
Sand off any rough/sharp edges.
Biocidal Product Regulation (EU 528/2012) Article 58 Information
This article contains timber treated with Celcure AC-500, incorporating biocidal products to give protection against wood destroying insects & wood rotting fungi
.
Contains:
Basic copper carbonate (Copper (II) carbonate – Copper (II) hydroxide (1:1)), Boric acid, Benzalkonium chloride.
Wear gloves when handling freshly treated wood. Avoid breathing dust when cutting treated or untreated wood. Dispose of off-cuts responsibly – do not burn.
7
Lift the roof sections in to place making sure that they are in line with the apex and
the door and plain ends.
Fix the roof in place using 30mm nails spaced in approximately 300mm intervals.
(Make sure the nails locate into the framework of the panels)
Place the barge boards against the front and back of the
shed. Make sure that these are in line with the roof sheet
and meet at the apex. Fix each in place using 3 x 40mm
screws.
Place a finial over the top of where the barge boards meet
and fix it in place using 2 x 30mm screws.
Unroll the felt and cut it in to two equal lengths. Place the
sheets on each side so that there is a 50mm overhang on the
eaves and they overlap at the apex. Fix these to the roof using
felt nails spaced in 150mm intervals. Cut and fold the corners
securing with a single felt nail for each.
8
5
I
9
Place the roof board on to one of the 898mm battens. Make sure that the
board is flush on all sides.
Fix each batten in place using 30mm nails spaced in 300mm intervals.
(Repeat for the other roof section)
K
J
F
G
Attention
Take care when
cutting and
trimming the roof
felt.
Place the hinge against the inside of the door frame and position the
large section of the hinge so that it is flush with the inside of the
framing as shown. Fix with 25mm screws.
Open the hinge and fix the smaller section to the door framing. Again
make sure that the hinge is flush and that the holes are positioned so
that the 25mm screws locate correctly into the batten.