background image

8

9

11

7

Forest Garden Ltd, Unit 288 Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB

Fix the ridge plate from inside the shed so that it bridges the two battens at the
apex together. Fix using 2 x 25mm screws

10

Biocidal Product Regulation (EU 528/2012) Article 58 Information

This article contains timber treated with Celcure AC-500, incorporating biocidal products to give protection against wood destroying insects & wood rotting fungi.

Contains:

Basic copper carbonate (Copper (II) carbonate – Copper (II) hydroxide (1:1)), Boric acid, Benzalkonium chloride.

Wear gloves when handling freshly treated wood. Avoid breathing dust when cutting treated or untreated wood. Dispose of off-cuts responsibly – do not burn.

Nailing through the roof sheet (G) in to the battens. Position the battens as shown.

1.The 2365mm batten (J) should be flush on all sides.
2.Place a 2275mm batten (K) so that it is offset 45mm on either side and has a 15mm offset on
the long side.
3.Place another 2275mm batten (K) in between, again with a 45mm offset on both sides.
Fix each batten in place using 30mm nails spaced in 300mm intervals.

Lift the roof sections into place making sure that they are in line with the apex and
the front and back panels of the shed.

Fix the roof in place using 30mm nails spaced in approximately 300mm intervals
(Make sure the nails locate into the framework of the side and end panels)

Unroll  the felt and cut it into three equal lengths. Place a section on each eaves so that
there is a 50mm overhang on each edge as shown. Fix this to the roof using felt nails
spaced in 150mm intervals. Cut and fold the corners securing with a single felt nail for
each.

Place the remaining section as shown making sure that the it overlaps the others. Again
secure each sheet in place using felt nails spaced in 150mm intervals.

Place the barge boards against the ends of the building so that they are flush with
the overhang of the roof and in line with the top. Fix each in place using 3x40mm
screws.

Place the finial where the barge boards join at the front of the shed. Secure in
place using 2x30mm screws.

Fix a Z’ bracket to
each end of the
2275mm battens
using a 25mm
screw for each.

B

K

15mm Offset

J

G

K

45mm Offset

Maintenance.

Regularly check all fixings are secure and the roofing felt has no holes or tears.

Sand off any rough/sharp edges.

G

pe

ncil lin

e

I

L

Attention

Take care when

cutting and

trimming the roof

felt.

Hasp

Staple

Position the Staple on one of the doors, making sure that it is in line with the framing
behind and fix it in place using 2 x 25mm screws.

Before fixing the Hasp to the door make sure that it is in line with the framing on the
reverse of the door and closes over the Staple. Fix this in place using 3 x 25mm screws.

6

1.

(s)

of shed, into window opening(s),

Place the window

from the outside

so that the

bubble faces inside the shed. Lip at bottom of window must overlap board at bottom
of window opening.
2.

bottom

Place the plastic strips on the outer side and

of each window so that one

side butts up against the cladding.
3. Fix the plastic strips using 2 x security screws for each strip.
4. Place the 675mm timber strip vertically between the two window sheets so that it
overlaps both sides. Fix to the framework using 2 x security screws.

Attention:

Take care when placing

the screws. These can

not be backed out.

You may need to

cut the plastic

strips to size using

a pair of scissors

H

Inside
of Shed

Outside
of Shed

Window

Lip

Cill

Board

H

H

P

M

Отзывы: