Fixing Pack (OPA68DDFP)
This fixing pack is used for several products.
There may be additional fixings.
Not to Scale
Important :
Assembly of this
shed requires a
minimum of two
adults.
MUST PRE DRILL
-
Issue 0118
FELT
B
OPA6PE
PLAIN END
OPA8WS
WINDOW PANEL
OPA8PS
PLAIN PANEL
236510708
ROOF BOARD
QTY 2
FELT78BL QTY 1
C
D
E
G
I
F
37282275PT
2275mm BATTEN QTY 4
FIN20010512PT
FINIAL
QTY 1
A
OPA68DD PARTS LIST
1
3
BRDFL46
FLOOR QTY 2
DDRPT
DOOR QTY 2
OPA6DDE
DOOR END
37282365PT
2365mm BATTEN QTY 2
44161570PT
1570mm CORNER STRIP QTY 4
H
K
L
N
H
J
Top View
2
D
C
Z’ bracket Qty 8
30mm Screw Qty 24
50mm Screw Qty 26
25mm Screw Qty 39
10mm Felt tacks Qty 100
Ridge Plate
30mm Nail Qty 86
45120675PPT
675mm STRIP QTY 1
M
RPET700
WINDOW QTY 2
The windows are packed
together tightly, separate
before assembly.
59121110PAII62PT
1110mm ANGLED BARGE BOARD QTY 4
84996
675mm PLASTIC STRIP QTY 4
P
Fix both of the floors together using 2x50mm
screws screwing through the floor bearers as
shown.
Place the panels on top of the completed floor. Make sure that all the panels are
tight and flush before fixing them to each other using 3x50mm screws.
When the panels are secured to each other, make sure they are square and fix
them to the floor using 3x50mm screws for each panel. Make sure the screws are
positioned so that they locate into the bearers underneath.
Flush Hinge
Qty 4
Hasp &
Staple
C
B
A
E
D
4
40mm Screw Qty 12
Place the hinge against the inside of the door frame and position
the large section of the hinge so that it is flush with the inside of
the framing as shown and fix with 25mm screws.
Open the hinge and fix the smaller section to the door framing.
Again make sure that the hinge is flush and that the holes are
positioned so that the 25mm screws locate correctly into the
batten.
F
IMPORTANT, RETAIN FOR FUTURE REFERENCE;
READ CAREFULLY
This
is pressure
to ensure longevity of all
buildings
treated
timber components and to protect against rot. This may leave
a colour difference on some parts that will even out as the
moisture content stabilises This will not need additional
.
treatment.
- Timber is a natural material. It will shrink and swell as a
result of varying moisture content.
- Due to the nature of the material the doors may need some
trimming for a neater fit.
- Please keep all plastic bags and small parts away from
children
- The roof of this building is not a load bearing structure.
- This product must be built on a solid level base.
Technical Helpline:
0333 7777 089
8.30 am and 5.00
pm Monday to Friday.
Please check all parts prior to assembly
Assembly of damaged parts may be deemed to be
acceptance and this may affect the remedies you are entitled
to.
If the product is not constructed in accordance with the
instructions, or is altered in anyway (e.g. painted), the
manufacturer cannot be held liable for any resulting damage.
25mm Security Screws
Screws Qty
10
O
45281630PT
45 x 1630mm BATTEN QTY 1
A
8’ x 6’ Overlap Apex Shed
Turn Button
Qty 3
REQUIRED TOOLS :
(NOT SUPPLIED)
POZI DRIVE
SCREWDRIVER
TAPE MEASURE HAMMER
SHARP KNIFE
FLAT HEAD
SCREWDRIVER
SCISSORS
Place the corner strips so that they cover
the joins between the panels. Fix each in
place using 4x30mm screws.
O
Place the 1630mm batten against the inside of the door so that it is tight against
the battens on the reverse and leaves a small gap at the top and bottom. Fix the
batten in place with 4 x 30mm Nails hammering through the door into the batten.
(make sure the batten is supported from the other side when fixing)
Fix a turn button to the top and bottom of the batten so that the door will be held
closed when fixed. Use a 30mm screw for each turn button.
5
M
N
Place and fix a turn button above the
opening door. Make sure that the button is
fixed to the door end and will hold the top of
the door shut.