E
F
G
H
PRE-DRILL
PRE-DRILL
PRE-DRILL
3
7
af
af
af
af
af
a
c
Place the angled pieces at the
top of the side panels so that
they are flush on all sides and
in line with the bottom of the
framework. Fix each in place
using 3 x 25mm screws.
Place and fix each
corner strip using 4 x
nails. Make sure these
are flush on all sides
before fixing.
Place the batten on top of the
door end and fix this in place
by screwing up through the
frame using 3 x 50mm screws.
Position the batten so it is tight
against the horizontal battens on the
reverse of the door and offset 21mm
from the top.
Fix the batten in place using 5 x nails.
5
8
6
a
g
a
b
7
The top of the hinge should be in line
with the horizontal batten as shown
d
x 6
Fix the smaller
piece of the hinge
to the door.
a
d
a
d
a
d
af
af
af
af
e
e
e
e
e
e
Place a turn button on
the top and bottom of
the batten.
28mm
Slamming Strip