background image

I

J

K

13

12

5

d

d

d

d

d

d

d

d

d

d

Position and line up the hasp
and staple with framing on the
inside of the door.

a

d

x 7

Fix the 481mm board to two of the 70mm battens.
These should be flush on the short side and off set
10mm from the long side. Fix the battens in place
using 2 x 25mm screws for each.

Repeat with the remaining blocks and 481mm board.

Forest Garden Ltd. | Unit 288 | Oak Drive | Hartlebury Trading Estate | Hartlebury | Worcestershire | DY10 4JB

Issue 0218

Make sure that the screws are
positioned so that each locates
into the batten.

PRE-DRILL

PRE-DRILL

PRE-DRILL

138cm

50cm

65cm

48cm

Отзывы: