Once the sides are fixed to the floor
attach the boards so that they are in
line with the boards on the left
and
ri
ght hand side and secure using
two 30mm screws at each end as
shown
2
3
Place the log store roof on top of
the structure so that the overhang is
at the front.
Fix in place using 2x50mm screws
for each side, screwing into the
batten underneath.
Forest Garden plc.
Unit 288 Hartlebury Trading Estate
Hartlebury
Worcestershire
Dy10 4JB
E-mail: [email protected]
www.forestgarden.co.uk