background image

A

B

C

D

PRE-DRILL

PRE-DRILL

PRE-DRILL

4

7

af

af

af

af

f

f

f

f

af

Place and fix the corner strips using 4 x

nails. Make sure these are flush on all

sides before fixing.

A

11

12

flush

flush

flush

af

af

af

af

af

af

af

13

10

a

d

a

d

Floor and Barge Board assembly

centr

e lin

e

Place the panels on top of the floor. Make
sure they are tight and flush before fixing

them to each other using 2 x 50mm

screws at each corner.

3

2

1

a

e

a

e

e

a

e

Fix the panels to the

floor using 3 x 50mm

screws to the front and

back and 1 x 50mm

screw for the sides.

Make sure the screws

locate into the floor

bearers.

e

e

e

13

6

14

8

d

d

a

d

a

d

Place the board onto the blocks. The
blocks should be flush on the narrow
side and offset 10mm from the long
side. Fix each in place screwing
through the board with  2 x 25mm
screws for each.

Repeat with the other boards and
remaining blocks.

These are the side barge boards for
the roof.

1

13mm

Place the angled boards against the

front and back panels as shown to

create an apex. Fix each board in

place using 2 x 25mm screws.

14 is for the
Overlap Garden
Store only.

Offset 21mm
at the top.

The batten should be fixed so it is

tight against the horizontal battens

on the reverse of the door and offset

12mm from the top.

Front Corner Strip

28mm

The top point of the

board should be offset
113mm from the panel

Отзывы: