Forest garden HW0079 Скачать руководство пользователя страница 3

8

7

ISSUE 0116

5

50mm

D

G

6

Measure the 
distance between 
the posts and cut 
the rails to the 
correct size so that 
they can fit in 
between the posts.

Fix the rail to the 
balusters you have 
previously secured 
using 2 x 45mm 
screws for each 
end.

(PRE-DRILL)

Cut the two hand 
rails to size and 
place these on top of 
the baluster 
assembly. 

Fix each in place 
using 4 x 45mm 
screws.

(PRE-DRILL)

Place a baluster 
against the post so 
that it is 50mm 
above the deck and 
flush with the 
outside of the post. 
Fix this in place 
using 3 x 50mm 
screws. Repeat for 
the other posts.

(PRE-DRILL)

Fix the remaining 
balusters to the 
outside of the rails 
making sure each is 
spaced 
approximately 
91mm apart.

Fix each in place 
with a 45mm screw 
at each end.

(PRE-DRILL)

E

G

E

E

B

Rail placed on 
the deck side.

Отзывы: