Step 7
Step 9
PLEASE NOTE - WINDOWS
CEDAR SHINGLES ROOF
10mm x 19mm
Stainless steel
staples should be
19mm from the
edge of the shingles
and 38mm above
the butts of the
course.
Alternative courses
should
4x
35mm
Nails
4x
35mm
Nails
BATTEN 2
Side Fascia
BATTEN 2
Side Fascia
Step 8
3x
35mm
Nails
3x
35mm
Nails
3x
35mm
Nails
3x
35mm
Nails
BATTEN 4
Fascia
BATTEN 4
Fascia
BATTEN 4
Fascia
BATTEN 4
Fascia
Step 6
Step 7
3x
50mm
Screws
3x
50mm
Screws
INTO
WALLS
3x
50mm
Screws
3x
50mm
Screws
INTO
WALLS
ROOF
CENTRAL
4x
50mm
Screws
4x
50mm
Screws
INTO
ROOF
INTO
ROOF
INTO
WALLS
INTO
WALLS
BATTEN 1
Roof Support Strip
Check
Side
BATTEN 1
BATTEN 1
Roof Support Strip
The windows
will
already be hinged into place -
one window side hinged
& the
other top hinged.
The casement stay will need to be fixed with 25mm screws.
PLEASE NOTE
Once the fascias are fixed,
the nail holes will need to
be filled with filler &
touched up with the paint
provided.
2x
25mm
Screws
2x
25mm
Screws
CASEMENT
STAY
2x
25mm
Screws
SIDE HINGED
TOP HINGED
FIXED FRAMES
FRA58 - 4 WINDOWS
FRA46 - 2 WINDOWS
TOP HINGED
SIDE HINGED
The 5' x 8' retreat shed will
have the
2 central windows
fixed with 60mm screws -
through the panel framework
into the window frame. 2 at
the top & 2 at the bottom.
Window Packers
will be used
to evenly space the windows
into the frames.
THE ROOF OF THIS BUILDING IS NOT A LOAD BEARING STRUCTURE