background image

Step 7

Step 9

PLEASE NOTE - WINDOWS

CEDAR SHINGLES ROOF

10mm x 19mm 

Stainless steel 

staples should be 

19mm from the 

edge of the shingles 

and 38mm above 

the butts of the 

course.

Alternative courses 

should

4x

35mm 

Nails

4x

35mm 

Nails

BATTEN 2

Side Fascia

BATTEN 2

Side Fascia

 

Step 8

3x

35mm 

Nails

3x

35mm 

Nails

3x

35mm 

Nails

3x

35mm 

Nails

BATTEN 4 

Fascia 

BATTEN 4 

Fascia 

BATTEN 4 

Fascia 

BATTEN 4 

Fascia 

Step 6

Step 7

3x

50mm 

Screws

3x

50mm 

Screws

INTO

WALLS

3x

50mm 

Screws

3x

50mm 

Screws

INTO

WALLS

ROOF

CENTRAL

4x

50mm 

Screws

4x

50mm 

Screws

INTO

ROOF

INTO

ROOF

INTO

WALLS

INTO

WALLS

BATTEN 1 

Roof Support Strip 

Check

Side

BATTEN 1 

 

BATTEN 1 

Roof Support Strip 

The windows 

will 

already be hinged into place - 

one window side hinged

 & the 

other top hinged.

 

The casement stay will need to be fixed with 25mm screws.

PLEASE NOTE

Once the fascias are fixed, 

the nail holes will need to 

be filled with filler & 

touched up with the paint 

provided.

2x

25mm 

Screws

2x

25mm 

Screws

CASEMENT

STAY

2x

25mm 

Screws

SIDE HINGED

TOP HINGED

FIXED FRAMES

FRA58 - 4 WINDOWS

FRA46 - 2 WINDOWS

TOP HINGED

SIDE HINGED

The 5' x 8' retreat shed will 

have the 

2 central windows 

fixed with 60mm screws - 

through the panel framework 

into the window frame. 2 at 

the top & 2 at the bottom.

Window Packers

 will be used 

to evenly space the windows 

into the frames.

THE ROOF OF THIS BUILDING IS NOT A LOAD BEARING STRUCTURE

Отзывы: