
P a g e
|
8
Mount Bracket
MOUNT BRACKET TO WALL
A
Locate Stud with Stud Finder
B
Verify Gang Box is installed on right side of stud.
Top Bracket hole should be between 35-
60” from floor
.
See page 2 dimensional graphic.
No Gang Box needed if AC Conduit Installation
C
Line up Mounting Bracket opening with Gang Box as
shown, use Level to align Bracket and mark the two
center mounting holes.
D
Use Drill w
ith 7/32” bit to drill pilot into stud.
E
Align Bracket on wall and Install (2) 3/8” x 2
-
1/2” Hex
Lag Bolts into wall using 9/16” Socket to tighten to wall.
(See Figure below).
QTY KIT ITEM
1
MOUNTING BRACKET
2
3/8” X 2
-
1/2” HEX LAG BOLT
TOOLS NEEDED
STUD FINDER
LEVEL
Drill with 7/32” Pilot Bit
9/16”
SOCKET
Install Lag Bolts using
9/16” Hex Head
7/32” Pilot holes
in the stud wall
Gang Box right side stud
mount (Standard Method)
Align Gangbox with opening
in Mounting Bracket
Содержание Pro NL38-10C823-AA
Страница 1: ......
Страница 2: ......
Страница 7: ......
Страница 10: ......
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 16: ......
Страница 19: ...P a g e 19 Appendix A Conduit Drilling Template Compatible with suggested gland conduit configurations ...
Страница 20: ...P a g e 20 ...
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 30: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 43: ...Page 20 ...
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 53: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 66: ...Página 20 ...
Страница 67: ......
Страница 68: ......
Страница 69: ......