background image

 

19.

NOTE: 

The EGR valve is shown removed for clarity. 

Disconnect the EVR solenoid electrical and vacuum harness. 

 

20. Remove the throttle body adapter. 

Remove the four bolts. 

Remove the throttle body adapter. 

Remove the throttle body adapter gasket. 

 

21. Remove the EVR bracket. 

Remove the bolts. 

Remove the bracket. 

 

22. Disconnect the five LH fuel injector electrical connectors. 

14

1999 F-Super Duty 250-550 Workshop Manual

1/16/2011

http://www.fordtechservice.dealerconnection.com/pubs/content/~WSXO/~MUS~LEN/20/...

Содержание F-Super Duty 250 1999

Страница 1: ...ose clamp and disconnect the water outlet hose 4 Remove the air cleaner outlet tube refer to Section 303 12 5 Remove the accelerator cable snow shield 6 Disconnect the accelerator and speed control ca...

Страница 2: ...five RH fuel injector electrical connectors and five ignition coil electrical connectors 12 Disconnect the idle air control motor electrical connector and the bypass hose 14 1999 F Super Duty 250 550...

Страница 3: ...lines 16 Remove the EGR transducer bracket 17 Position the EGR valve to exhaust manifold tube aside Disconnect the upper fitting Loosen the lower fitting Position the tube aside 18 Disconnect the EGR...

Страница 4: ...move the four bolts Remove the throttle body adapter Remove the throttle body adapter gasket 21 Remove the EVR bracket Remove the bolts Remove the bracket 22 Disconnect the five LH fuel injector elect...

Страница 5: ...e the ten ignition coils 26 Disconnect the fuel injection supply manifold Disconnect the fuel lines Disconnect the vacuum connector from the fuel pressure regulator 27 Position the radio interference...

Страница 6: ...e intake manifold gaskets 31 If required remove the fuel injection supply manifold Remove the seven bolts Remove the fuel injection supply manifold 32 Separate the upper and lower intake manifolds 942...

Страница 7: ...lation 1 Position the lower intake manifold gasket 9461 and the upper intake manifold on the intake manifold and loosely install the ten bolts 2 NOTE Tighten the bolts in two stages Tighten the bolts...

Страница 8: ...ll the upper intake manifold Position the upper intake manifold gaskets and the intake manifold and loosely install the bolts 6 Tighten the bolts in two stages in the sequence shown Stage 1 Tighten to...

Страница 9: ...to the fuel injection supply manifold 10 Install the ignition coils Position the ten ignition coils Install the ten bolts 11 Install the generator refer to Section 414 02 12 Connect the water tempera...

Страница 10: ...5 Install the throttle body adapter Position a new throttle body adapter gasket Position the throttle body adapter Install four bolts and tighten in two stages Stage 1 Tighten to 8 10 Nm 71 88 lb in S...

Страница 11: ...ust manifold tube Hand tighten the fittings Tighten the upper fitting to 55 65 Nm 41 47 lb ft Tighten the lower fitting to 55 65 Nm 41 47 lb ft 19 Install the EGR transducer bracket Position the brack...

Страница 12: ...ter hose 23 Connect the idle air control motor bypass hose and connector 24 Connect the five RH fuel injector electrical connectors and five RH ignition coil connectors 14 1999 F Super Duty 250 550 Wo...

Страница 13: ...oster engine control sensor wiring harness 28 Install the accelerator bracket Position the bracket Install the bolts 29 Connect the accelerator and speed control cables and return spring 30 Install th...

Страница 14: ...the engine water outlet hose and position the hose clamp 33 Fill the cooling system refer to Section 303 03 34 Connect the battery ground cable 14 1999 F Super Duty 250 550 Workshop Manual 1 16 2011 h...

Отзывы: