WARNING: 

3) 

Ensure the needle valve is fully closed

.

  Move the pump control valve 

handle from "squeeze" to "

release".  As this is done, the tool will start to open

 immediately.  Should the operator want to stop the release, return the pump
 

control valve handle to the squeeze position.  The orifice in the needle valve controls the 
release rate.  As the pipe opens, the pressure in the tool will decrease and the release 
rate will slow down.  Once the pipe is sufficiently relaxed and the tool does not open any 
further, the operator can then 

fully

 

open the needle valve to raise the bars more rapidly 

for a complete release.  

By opening the needle valve early, a large amount of oil will 

enter into the pump and cause it to overflow, which may result in seal damage to 
the pump.

 

Having the pump control valve handle to the release position, start to pump.  

Continue to open the tool until it can be removed from the pipe. 

Once the tool is fully 

open, do not continue to pump.

  

Continuing to pump will cause hydraulic oil to be 

vented from the relief valve to prevent tool damage. 
 
4)  To remove the tool from the pipe let the upper bar rest against the pipe.  Pull

 up 

the locking pin then rotate the bottom bar clear of the pipe.  The tool may now be lifted 
clear of the pipe. 

Be aware that the balance of the tool will shift because of the 

change in position of the lower bar.   

 

 
5) If re-rounding of pipe is not to be performed, the grounding spike may now be 
removed and the tool can be repacked into its shipping container, in the open position. 
 

 

RE-ROUNDING THE PIPE, IF REQUIRED

 

 
Once the tool is fully open reposition the tool 90

°

 from the original squeeze on the top of 

the peaks of the squeeze.  Squeeze the pipe back to its original shape as outlined in 
“Installation on Pipe” and “Squeezing the Pipe” detailed above. Consult your local utility 
for their specific recommendations regarding this procedure.   The grounding spike may 
now be removed and the tool can be repacked into its shipping container, in the

 

closed position. 

 

ECN1638A 

C1

600 SQUEEZE OFF TOOL FOR PE PIPE 

Page 

6 of 9

 

 

RELEASING THE PIPE

 

1)  Unscrew the lock-down bolts located at each end of the clamping bars.  It will be 
necessary to place the pump control valve into the "squeeze" mode and apply more 
pressure to the tool to relieve the upward strain on the bolts created by the pipe trying to 
bounce back. 
 
2)  To avoid any damage to the pipe it is critical that a slow release rate be achieved.  A 
release rate of 1/2 inche per minute is recommended.  This time allows for the PE pipe 
to "flow" minimi

zing the chances of pipe damage.  Below 32

°

F (0°C), the release rate 

should be slower.  Consult your local utility for their specific recommendations regarding 
their prescribed release rate. 

 

Содержание C16000

Страница 1: ...C1600...

Страница 2: ...ng pressure while holding existing pressure in the hose Cleanliness is critical while checking and refilling oil Use a funnel with a filter Do not allow any dirt to enter the reservoir 2 If motion of...

Страница 3: ...ghten fittings until you can no longer see ORANGE paint on the inside collar Correct Incorrect Notice the hoses have a male and female end attached to them that fit with mating parts on the squeeze of...

Страница 4: ...result The operator should visually check to ensure that the pin has engaged in the slot of the bar so that the locking plate will hold the lower bar in the closed position There should not be any gap...

Страница 5: ...res a steel lock down bolt at each end of the upper bar to allow the tool to be locked on a squeeze and the hydraulics detached or in the event that hydraulic pressure is lost with a minimum loss of f...

Страница 6: ...e that the balance of the tool will shift because of the change in position of the lower bar 5 If re rounding of pipe is not to be performed the grounding spike may now be removed and the tool can be...

Страница 7: ...ote that item 11 is pre calibrated at the factory for proper operation of the tool and it should NOT be tightened Ensure the tool is in good operating order by routinely checking the following whichev...

Страница 8: ...If you experience difficulty obtaining flow control when squeezing HDPE pipe we recommend you perform a double squeeze and vent to atmosphere Please consult your local Utility for their specific oper...

Страница 9: ...0 8 30 HHCS 3 4 10UNC X 3 LG 99 100 00 1224 8 29 HYDRUALIC MANIFOLD LONG C1600 30 2 28 HYDRUALIC MANIFOLD SHORT C1200 47 2 27 GAUGE STOP 12 SDR11 15 5 C1600 25 2 26 FLAT WASHER 1 2 O D 99 141 00 0016...

Страница 10: ...ERWISE C1600 A1 ASM DWG 16 HYD SQUEEZE OFF TOOL 261 Ton Force FOOTAGE TOOLS INC 25 26 13 11 16 24 3 12 17 4 24 16 50 42 8 10 9 51 52 28 29 32 40 38 35 47 21 39 33 52 51 29 28 34 18 7 22 2 1 23 6 55 37...

Страница 11: ...r will not accept any charges for labor and or parts incidental to the removal or remounting of parts repaired or replaced under this Warranty This Warranty shall not apply to any part or product whic...

Страница 12: ...y registration now available online Please visit www footagetools com and click on warranty registration Model S N IMPORTANT NOTICE IMPORTANT NOTICE Vaughan Ontario 54 Audia Crt Unit 1 Toll Free 1 888...

Отзывы: