Parts:
Step 2:
Step 1:
Step 3:
D
C
E
F
Mark the 4 drilling positions then use
the Ø6 mm drill to drill holes on the
wall according to the marked hole
position.
Inset the plug(D) into the hole, hold the fix
base (C) use the tapping screw (D) through
fix base(C) holes, tighten the tapping screw
(D) tighten the top shower fixed bar(E) and
the inlet hose (F) with the fix base (C)
Fixed the top shower with the top
shower fixed bar (E) , then connect with
the inlet hose (F) .
Shower Head Installation Instructions
E
F
FontanaShowers
©
FontanaShowers
©
FontanaShowers
FontanaShowers
Customer Service: 800-684-4489
fontanashowers.com
2