background image

 

Page 15 sur 15 

 

12. WARRANTY 

ISE Metal inc. warrants that the stop logs it manufactures and delivers to the Buyer are free from defects 
in  material,  workmanship  and  fabrication  for  a  period  of  60  months  from  the  date  of  receipt  of  the 
equipment at their installation location.  To benefit from this warranty, the  Buyer shall promptly report in 
writing  any  failure  during  the  warranty  period.   Provided  that  the  buyer  has  stored,  installed,  maintained 
and used the equipment in a workmanlike manner and has complied with the manufacturer’s  instructions 
and  recommendations  put  forth  in  the  Installation,  Operation  and  Maintenance  Manual,  at  its  discretion, 
ISE Metal will either correct the defect at its factory or provide the required parts. Shipping costs from the 
factory  to  the  installation  site  and/or  labor  on  the  equipment  installation  site  are  not  covered  by  this 
warranty.   Accessories  and  equipment  supplied  by  ISE  Metal  inc.  with  the  gates,  but  manufactured  by 
others will be protected by the warranty offered to ISE Metal by the manufacturers of the equipment which 
are  transferable  to  Buyer.   ISE  Metal  inc.  will  not  be  held  responsible  for  any  direct,  indirect, 
consequential, contingent or incidental damages, repairs, replacements or other fixes and adjustments to 
the equipment nor any labor costs incurred by the Buyer or its subcontractors or others without the prior 
written  consent  of  ISE  Metal  Inc.   The  effects  of  corrosion,  erosion  and  normal  wear  and  tear  are 
specifically excluded from this warranty. The Buyer shall not use equipment that is considered defective 
without first obtaining a written consent of ISE Metal inc., otherwise the Buyer uses the equipment at their 
own risk and responsibility. 
 
ISE Metal Inc. provides no other warranty or makes no other express or implied representation and any 
implied warranty of fitness for a particular purpose is declared non-existent. 
 
Corrections  by  ISE  Metal  inc.  of  non-compliance  described  above  constitute  complete  fulfillment  of  its 
responsibility in this manner. 
 

13. CONTACT FONTAINE AQUANOX 

 
If needed, Fontaine-Aquanox can be contacted with the following methods: 
 
Web site:  http://www.ISEAquanox.com 
Phone:  (819) 769-0157    or toll free: 1-855-769-0157 
Mailing address:   20 route de Windsor, Sherbrooke (Quebec), Canada, J1C 0E5 
 
 

Содержание 98 Series

Страница 1: ...SERIES 98 EXTRUDED ALUMINUM STOP LOGS INSTALLATION AND MAINTENANCE MANUAL Revision 0 ...

Страница 2: ... Surface mount 6 7 Embedded frame installation 8 8 In channel surface installation 9 9 Operation with lifting device 11 9 1 Lowering a stop log 11 9 2 Removing a stop log 11 10 Troubleshooting 12 10 1 Stop logs jamming 12 10 2 Stop log lifting beam doesn t perform well 12 10 3 Stop logs leak 12 10 4 Lip HY Q Seal 13 11 Inspection and maintenance 14 11 1 Inspection frequency 14 11 2 Maintenance 14 ...

Страница 3: ...learly diagnose problems and make to proper basic adjustments 2 1 WARNINGS It is important to read this manual before starting any work on the equipement When installing the equipment always apply an anti seize on the stainless steel fasteners Use PTFE based pipe joint compound if the equipement is installed in drinking water Reduce as much as possible the contact between stainless steel and carbo...

Страница 4: ...king days verify with the bill of lading that all equipment has been received Also verify the equipment tag They must match the items listed on the bill of lading No claims for missing parts will be accepted after the period of 5 working days Contact Fontaine Aquanox to report any anomalies found or missing parts 4 STORAGE Cover and protect all equipment that will not be installed immediately Leav...

Страница 5: ...Page 5 sur 15 5 GLOSSARY FOR STOP LOGS Figure 1 ...

Страница 6: ...nnel width should be the same as the gate clear opening inside the frame 5 Measure the overall width of the frame From the channel center previously marked place another mark in the boxouts equivalent to half of the frame overall width Repeat the other side The outside limits of the frame will be positioned to those marks 6 Drop a plumb line into the boxout centered on the mark indicating the outs...

Страница 7: ...ntact a qualified professional 4 Drop a plumb line on one side of the channel at the installation location Pull the line toward the wall until the nearest point for the whole channel depth is at 16mm 5 8 from the wall Mark the position on the bottom of teh channel see Figure 3 5 Drop the plumb line on the other side of the channel from the position located at point 3 Repeat the process to locate t...

Страница 8: ...6mm 5 8 between all parts of the frame and the boxouts to allow proper grouting If needed reposition the gate while maintaining the sill level and verticality of the sides 8 Check squareness of the free opening using a straight edge or a tight string from one corner to the other A variation of 2mm or less is acceptable Correct if needed with the wooden shims 9 Measure across the channel the distan...

Страница 9: ...ther and the bolts firmly tightened 7 Place a plumb line on both side of the channel near the frame sides Check and adjust verticality of the frame sides in both axes along the whole channel depth Tolerance on verticality is 3mm 1 8 on the channel depth Maintain the frame sides in position using the crane or other method depending on the available tools Figure 6 8 Make sure to maintain a minimum g...

Страница 10: ...s Adjust as needed with the shims and anchors making sure the distance is the same as at the sill 15 Lower one stop log or the stop plate into the frame Check the contact between the bottom seal and the bottom section of the frame sill by using a flashlight The seal on the log or plate has a lip that should be in contact with the sill on its entire width Remove the log or plate before grouting 16 ...

Страница 11: ...device and bring them above the frame Lower the log into the frame until it reaches the bottom or the top of the logs that were previously lowered into the frame 5 Continue to lower the device an inch or two and then pull the rope to unhook the log Lift the lifting device out of the frame with the crane or chainblock 6 Repeat the steps with the other logs 9 2 REMOVING A STOP LOG 1 Hook the lifting...

Страница 12: ... hoisting mechanism as necessary Are all gate seals properly attached to the stop logs Do any of them interfere with insertion or removal of stop logs Re tighten retainer strips and bolts and or other attaching hardware Re bond mitered joints Undertake seal repair 10 2 STOP LOG LIFTING BEAM DOESN T PERFORM WELL Is the stop log lifting beam in good condition Are there any bent or broken sections Ha...

Страница 13: ...hop order and the gate drawing numberat the time of ordering the seal Cut the replacement seal to length using the existing seal as a template Place the attaching bar on the new seal in the same in the same relative location it was on the damaged seal Use this bar for a template to mark the seal in order to drill or punch the holes Put the replacement seal on the bottom of the disc and attach in p...

Страница 14: ...inspection 20 uses after the initial inspection or six months after start up whichever comes first Subsequent inspections Every 50 uses or every six months whichever comes first If the stop plates or logs intensively or in extreme conditions perform inspection every three months 11 2 MAINTENANCE Clean the plates and logs and their seals with clean water to get rid of any deposit Verify that the se...

Страница 15: ...ufacturers of the equipment which are transferable to Buyer ISE Metal inc will not be held responsible for any direct indirect consequential contingent or incidental damages repairs replacements or other fixes and adjustments to the equipment nor any labor costs incurred by the Buyer or its subcontractors or others without the prior written consent of ISE Metal Inc The effects of corrosion erosion...

Отзывы: