37
and the following cleaning operations:
• Internal areas of the boiler.
• Gas nozzles.
• Air intake and flue gas exhaust system (model TFS only).
• Draught stop device (model TN only).
• Vent grille in boiler room (model TN only).
• Flue side of the heat exchanger.
When implementing a boiler maintenance schedule for the very first time, also check:
• Suitability of the boiler room.
• Air vents in the boiler room (model TN only).
• Diameter and length of flue system pipes.
• Boiler installation in accordance with the “Installation manual”.
If the boiler does not operate correctly, or if it poses a danger to people, animals or property, inform the system supervisor both
verbally and in writing.
5.2. Analysis of combustion parameters
The boiler combustion parameters must be checked in accordance with legal requirements to determine the efficiency and the emission of
pollutants.