background image

3.4 Starting the boiler

3.4.1 Preliminary checks

Before starting the boiler it is advisable to check that:
•  The  flue  gas  duct  has  been  installed  in  compliance  with 
instructions.  When the boiler is running no products 
generated by combustion are to leak from any of the 
gaskets
.
• The boiler power supply is 230 V – 50 Hz.
• The system is properly filled with water (pressure on the water 
gauge 0.8 / 1 bar).
• All stopcocks in the system’s piping are open.
• The fuel supply stopcock is open.
• There are no gas leaks.
• The external main switch is on.
• The boiler’s safety valve is not blocked.
• There are no water leaks.

To speed up and facilitate igniting the boiler for the first time, 
bleed the air out of the gas piping using the gas pressure valve 
socket.
Close the pressure socket carefully after bleeding the system.

3.4.2 Starting up and switching off

For starting up and switching off the boiler, follow the “User’s 
Instructions”.

3.5 Wiring diagrams

BC: Flame control
EA: Ignition electrode
ER: Flame detection electrode
F1: Protection fuse F4A 250V
IG: Main switch [marked “on/off” on the printed circuit]
L1: Flue gas thermostat / gas pressure gauge indication
L3: CH pump indication
L4: Burner ON indication
L5: Safety thermostat indication
L6: Burner cut-out indication (only E models). 
Lon:Power ON indication
Mn: Minimum thermostat (optional) [marked “Tm” on
the printed circuit]
MT: Motor timer (optional) [marked TIMER on the printed
circuit]
PA: Water pressure switch (optional) [marked with the
pressure switch symbol on the printed circuit]
PC: CH pump
Pgas: Gas pressure switch
PZ: Ignition piezoelectric unit
P1: Burner reset button
R: Heating thermostat [marked “Tr” on the printed circuit]
TA: Ambient thermostat
TS: Safety thermostat
TF: Flue gas thermostat
TM: Contact timer (optional) [marked TIMER on the
printed circuit]
VG, VG1,VG2: Gas Valve

= Light blue 

br 

= Brown

g  

= Grey

p  

= Pink 

v  

= Violet 

bl   = Dark blue 
bk   = Black
gn   = Green
r  

= Red 

= Yellow 

= White

ygn  = Yellow/Green 
o  

= Orange

 The plant pump must be connected directly to the boiler terminal board (terminals 11 and 12).

14

Содержание BALI RTN 18

Страница 1: ...BALI RTN IST 03 C 358 01 INSTALLATION USE AND MAINTENANCE EN...

Страница 2: ...Dear Customer Thank you for choosing and buying one of our boilers Please read these instructions carefully in order to install operate and maintain this equipment properly 2...

Страница 3: ...materials can be recycled and must be taken to specific separated collection areas Keep the packing out of reach of children as by its very nature it may constitute a source of danger Should the equip...

Страница 4: ...12 3 1 Installation standards page 12 3 2 Installation page 12 3 2 1 Packaging page 12 3 2 2 Choosing where to install the boiler page 12 3 2 3 Installing the boiler page 12 3 2 4 Ventilation of boil...

Страница 5: ...ly Burner cut out LED red only E models 7 This light indicates that the burner safety device has tripped due to a malfunction Burner operation LED yellow 8 This light indicates that the burner is oper...

Страница 6: ...he case of LPG boilers there may be airlocks in the pipes The boiler s burner may cut out a few times Restart the burner using the reset button see the following paragraphs 1 2 2 Switching off For E m...

Страница 7: ...intenance The user is obliged to have routine maintenance done on the boiler and the burner once a year Correct maintenance of the boiler allows it to work under the best conditions protects the envir...

Страница 8: ...1992 European Community Low Voltage Directive 73 23 EEC dated 19th February 1973 as amended by Directive 93 68 EEC dated 22nd July 1993 and they are fitted with all the safety devices called for in th...

Страница 9: ...25 G1 1 2 G1 1 2 G 3 4 110 RTN RTN E 24 525 G1 1 2 G1 1 2 G 3 4 130 RTN RTN E 32 RTN RTN E 36 625 G1 1 2 G1 1 2 G 3 4 130 RTN RTN E 48 765 G1 1 2 G1 1 2 G 3 4 150 MODEL L mm Flow M Return R Gas G Flue...

Страница 10: ...perature C 45 85 Electrical power supply V Hz 230 50 Electrical power W 10 Fuse on power supply A 4 Natural gas G20 CO2 value 5 8 5 5 6 4 6 5 7 0 Flue gas temperature C 110 120 110 120 120 130 120 130...

Страница 11: ...er supply V Hz 230 50 Electrical power W 20 Fuse on power supply A 4 Natural gas G20 CO2 value 6 5 6 3 6 8 5 5 5 5 Flue gas temperature C 110 120 110 120 120 130 110 120 110 120 Flue gas mass flow Kg...

Страница 12: ...d return pipes Remember that the plumbing system must include all the safety and control elements required in terms of current standards safety valve water pressure switch heat discharge valve pressur...

Страница 13: ...earth the system Gas water or heating system pipes are not suitable for earthing the system 3 2 9 Plumbing connections Before installation the boiler should be cleaned in order to remove as far as po...

Страница 14: ...ns 3 5 Wiring diagrams BC Flame control EA Ignition electrode ER Flame detection electrode F1 Protection fuse F4A 250V IG Main switch marked on off on the printed circuit L1 Flue gas thermostat gas pr...

Страница 15: ...3 5 1 General layout mod 18 48 RTN E fig 7 mod 18 48 RTN fig 6 15...

Страница 16: ...mod 70 100 RTN E fig 9 mod 60 RTN E fig 8 16...

Страница 17: ...mod 18 48 RTN E 3 5 2 Topographical diagrams fig 7A mod 18 48 RTN fig 6A 17...

Страница 18: ...mod 60 RTN E fig 8A mod 70 100 RTN E fig 9A 18...

Страница 19: ...or leaks especially the points that were disconnected Affix the self adhesive label provided that indicates the type of gas and pressure for which the equipment is set 19 4 MAINTENANCE In order to ens...

Страница 20: ...40 Tel 39 0365 878 31 Fax 39 0365 878 524 e mail info fondital it www fondital com The producer reserves the right to modify the data contained herein at any time without prior notice Uff Pubblicit Fo...

Отзывы: