3.4 Starting the boiler
3.4.1 Preliminary checks
Before starting the boiler it is advisable to check that:
• The flue gas duct has been installed in compliance with
instructions. When the boiler is running no products
generated by combustion are to leak from any of the
gaskets.
• The boiler power supply is 230 V – 50 Hz.
• The system is properly filled with water (pressure on the water
gauge 0.8 / 1 bar).
• All stopcocks in the system’s piping are open.
• The fuel supply stopcock is open.
• There are no gas leaks.
• The external main switch is on.
• The boiler’s safety valve is not blocked.
• There are no water leaks.
To speed up and facilitate igniting the boiler for the first time,
bleed the air out of the gas piping using the gas pressure valve
socket.
Close the pressure socket carefully after bleeding the system.
3.4.2 Starting up and switching off
For starting up and switching off the boiler, follow the “User’s
Instructions”.
3.5 Wiring diagrams
BC: Flame control
EA: Ignition electrode
ER: Flame detection electrode
F1: Protection fuse F4A 250V
IG: Main switch [marked “on/off” on the printed circuit]
L1: Flue gas thermostat / gas pressure gauge indication
L3: CH pump indication
L4: Burner ON indication
L5: Safety thermostat indication
L6: Burner cut-out indication (only E models).
Lon:Power ON indication
Mn: Minimum thermostat (optional) [marked “Tm” on
the printed circuit]
MT: Motor timer (optional) [marked TIMER on the printed
circuit]
PA: Water pressure switch (optional) [marked with the
pressure switch symbol on the printed circuit]
PC: CH pump
Pgas: Gas pressure switch
PZ: Ignition piezoelectric unit
P1: Burner reset button
R: Heating thermostat [marked “Tr” on the printed circuit]
TA: Ambient thermostat
TS: Safety thermostat
TF: Flue gas thermostat
TM: Contact timer (optional) [marked TIMER on the
printed circuit]
VG, VG1,VG2: Gas Valve
a
= Light blue
br
= Brown
g
= Grey
p
= Pink
v
= Violet
bl = Dark blue
bk = Black
gn = Green
r
= Red
y
= Yellow
w
= White
ygn = Yellow/Green
o
= Orange
The plant pump must be connected directly to the boiler terminal board (terminals 11 and 12).
14
Содержание BALI RTN 18
Страница 1: ...BALI RTN IST 03 C 358 01 INSTALLATION USE AND MAINTENANCE EN...
Страница 15: ...3 5 1 General layout mod 18 48 RTN E fig 7 mod 18 48 RTN fig 6 15...
Страница 16: ...mod 70 100 RTN E fig 9 mod 60 RTN E fig 8 16...
Страница 17: ...mod 18 48 RTN E 3 5 2 Topographical diagrams fig 7A mod 18 48 RTN fig 6A 17...
Страница 18: ...mod 60 RTN E fig 8A mod 70 100 RTN E fig 9A 18...