background image

6

Maestro Plus 

Bin  •  RIDE Technology

3. 

Bin Top Preparation

3.1 

Mount thermostat box

3.2 

Install shuttle actuator and bracket

DOUBLE-SIDED TAPE

SHUTTLE 

ACTUATOR

THERMOSTAT

GROMMET

NUT

THERMOSTAT
BRACKET

 

§

Apply double-sided tape to bottom of thermostat box 
and mount box on bin.

 

§

Install thermostat grommet 

.

 

§

Remove protective tape and apply gaskets 

 to 

shuttle actuator and nut.

 

§

Place shuttle actuator in hole 

.

 

§

Install thermostat bracket 

 and nut 

. Ensure 

that nut captures the thermostat bracket, then 
hand tighten.

3.3 

Route thermostat

SHUTTLE 

ACTUATOR

2"

APPROX

1"

3/4" RADIUS

(APPROX.)

1

2

 

§

Route thermostat through grommet and into bin 

.

 

§

Secure thermostat in bracket 

.

Содержание Maestro Plus MCC425A BS

Страница 1: ...E Technology Installation Instructions for Ice Storage Bin MCD425A W BS MCE425A W BS MME425A W BS MCC425A W BS MMC425A W BS See model number configurator on page 2 for details self contained 801 Churc...

Страница 2: ...agent or similarly qualified persons in order to avoid a hazard Connect to potable water supply only This appliance can be used by children aged 8 years and above and persons with reduced physical sen...

Страница 3: ...tat box 6 Install shuttle actuator and bracket 6 Route thermostat 6 Mount Ice Machine 7 External Connections 7 Air cooled ice machines only 7 Water cooled ice machines only 7 Bin thermostat cable 8 Tr...

Страница 4: ...4 Maestro Plus Bin RIDE Technology 1 Unpack Carefully unpack and inspect the contents of your Follett ice machine 1 1 Unpack Ice Machine...

Страница 5: ...the manufacturer its service agent or similarly qualified persons in order to avoid a hazard MCD425 A W BS 115 60 1 115 V 10 15A breaker MCD requires a 15A dedicated circuit MCE425 A W BS 230 50 1 5 5...

Страница 6: ...to bottom of thermostat box and mount box on bin Install thermostat grommet Remove protective tape and apply gaskets to shuttle actuator and nut Place shuttle actuator in hole Install thermostat brac...

Страница 7: ...chine must have at least 1 4 per foot 6 4 mm 0 3 m pitch Install ice machine potable water supply 3 8 FPT Note Follett recommends a Follett water filter system be installed in the ice machine inlet wa...

Страница 8: ...thermostat cable ICE MACHINE THERMOSTAT BOX ON BIN Note Do not apply power to ice machine bin signal connection Ice machine can only see contact closure Connect 2 pin bin thermostat cable at thermost...

Страница 9: ...ore making connection to ease assembly 4 Push transport tube onto shuttle actuator nozzle 5 Position clamp behind lip on shuttle actuator nozzle and tighten clamp 6 Run insulated tube without dips bet...

Страница 10: ...zing instructions 7 1 Before turning on power 1 Turn on water to ice machine 2 Check that hose clamp securely holds ice transport tube on nozzle 7 2 After turning on power 1 Turn on power to ice machi...

Страница 11: ...Bin RIDE Technology Maestro Plus 11...

Страница 12: ...Church Lane Easton PA 18040 USA Toll free 877 612 5086 1 610 252 7301 www follettice com Maestro Plus and Harmony are trademarks of Follett LLC Follett Chewblet and RIDE are registered trademarks of...

Отзывы: