6
self-contained
BIN • TOP-MOUNT
Prepare the bin.
3
Bin preparation
• Remove protective tape from
gaskets
Bin top preparation
3.1
➋
➊
➊
➌
• Apply gaskets
➊
• Install shuttle actuator
➋
through
dispenser top and secure with locking
nut
➌
Bin top preparation
3.2