HARMONY • TOP-MOUNT
remote condensing
5
Prepare the installation site.
2
➎
➍
3/8"
∅
(9,5mm)
1/4"
1'
NEMA
5-15
➋
➊
➌
Site preparation
Electrical
➊
• 120/60/1-6 amps
Potable water supply
➋
• 10-70 psi (69-483kpa)
• 45-90 F (7-32 C)
• Water supply must be treated by a scale-inhibiting fi lter (item# 00130286)
Drain
➌
• The drain line from the ice machine must be vented and have at least 1/4” per foot pitch
(6,4mm/0,3m)
Refrigeration lines
➍
• 5/8” (15,8mm) diameter suction (insulated)
➍
• 3/8” (9,5mm) liquid
➎
2.1
Provide drainage, water supply and electrical power to within 6 feet (2m) of ice
machine in accordance with local and national codes. Outdoor installation of
low side is not recommended and will void warranty.
Installation site requirements
2.1
Содержание Horizon HCD700NHT
Страница 11: ...HARMONY TOP MOUNT remote condensing 11...
Страница 19: ...HARMONY TOP MOUNT remote condensing 19...