14
remote condensing
Cornelius • RIDE Technology
Connect louvered docking assembly to ice machine.
8
Internal connections
Refrigeration lines
8.3
• Slide ice machine into louvered docking
assembly
ensuring that drain tube is fully
seated on barbed drain fitting
➊
• Insert ice transport tube all the way into
coupling and tighten nut firmly
➋
Ice transport tube installation
8.1
• Insert potable water line into valve
➊
Water line
8.2
• Remove twist tie
• Carefully pass cord thru opening and plug
into wall outlet
Power cord
8.4
➊
• Evacuate line set.
• Connect self-sealing liquid and suction
line fittings
➊
➊
➋
➊
Содержание Horizon Chewblet 1810 Series
Страница 18: ...18 remote condensing Cornelius RIDE Technology...
Страница 19: ...19 Cornelius RIDE Technology remote condensing...