background image

 

 
 
 
 
 

Safety Instructions 

 

Read all labels and instructions before beginning installation.  This equipment meets or 
exceeds existing electrical codes as defined in the National Electric Code (NEC).  Refer to 
local codes to ensure compliance and always use a licensed contractor for water and 
electrical hook-ups.  Use proper safety equipment during service work.    

 

The  Revolution®  II  must  be  grounded.    In  the  event  of  a  malfunction,  grounding  will 
reduce  the  risk  of  electric  shock  by  providing  a  path  of  least  resistance  for  the  electric 
current.    The  unit  is  equipped  with  a  cord  having  a  ground  conductor  and  must  be 
connected  to  an  appropriate  outlet  that  is  installed  and  grounded  in  accordance  with  all 
local codes and ordinances.  Improper connection of the equipment grounding can result in 
a risk of electric shock.   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Always use fresh, potable water to supply the system.  Do not use water that has not been properly tested or 
treated for bacteria, contaminants, etc…  Completely drain the system after each use. 
 

 

Maintenance Instructions

 

 

Fog Nozzles 

-

 

The nozzles and anti-drip valve should be inspected twice a year to ensure proper performance.   

-

 

If mineral deposits affect the operation of these items, the component should be removed from the system 
and cleaned using Fogco Nozzle Cleaner. 

-

 

If cleaning does not improve the performance, the component should be replaced.   

 

 

 

Installation Instructions 

 

Operation of the Revolution II 
The  Revolution  II  is  designed  for  use  with  the  appropriately  rated  tubing  and  fittings  to  create  a  fog  system  for 
outdoor  cooling,  humidification,  or  dust  and  odor  control.    The  unit  should  be  installed  at  least  8  feet  above  the 
ground level and at least 24 inches below the ceiling.  All Safety Instructions and Operating Instructions should 
be followed to ensure safe operation of the equipment.
   
 

-

 

The unit should be installed at least 8 feet above the ground level.   

-

 

The unit includes a hanging bracket with a pre-mounted ¼-20 nut.   

-

 

Use the appropriate length of ¼-20 all thread for mounting.   

-

 

Insert a ¼-20 nut onto the end of the all thread.   

-

 

Insert the end of the all thread into the top of the bracket. 

-

 

Tighten the previously inserted nut onto the bracket to prevent the unit from turning during operation.   

-

 

Connect the pre-wired electrical cord to the appropriate power supply. 

-

 

Connect the provided length of ¼” nylon tubing to the slip lok fitting on the nozzle ring.   

-

 

Connect the other end of the tubing to the provided ¼” slip lok X ¼” mnpt fitting.  Use this fitting to adapt 
to the system feed line.    

-

 

Insert the desired nozzles into the 6 individual fittings on the fog ring.    

-

 

If  the  system  will  be  used  in  freezing  conditions,  the  feed  line  should  be  drained  after  each  use  and  air 
purged when not in use.   

 

 
 
 

 

  

Отзывы: