![FOG Enforcer GREASE ENFORCER Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/fog-enforcer/grease-enforcer/grease-enforcer_operation-and-maintenance-manual_2314671019.webp)
©2017 FOG Enforcer All rights reserved • Patented/Patents Pending • Specifications subject to change without notice
FOG Enforcer • 2014 Beeler Road • Wilson, NC 27893 • Phone (844) 235-0369
MNLGE
19
Grease Timing Chart
GREASE ENFORCER
GREASE TIMING CHART
Not T
o Be
Altered By Non-Factory Personnel
PRE-PROGRAMMED OPERA
TION SEQUENCE STEPS. EACH STEP
IS EQUAL
TO 2 MINUTES.
SEQUENCE BEGINS WHEN 24-HOUR TIME CONTROLLER OUTPUT SWITCHES FROM OFF T
O ON
(INPUT #1)
AND ST
OPS WHEN THE CYCLE IS COMPLETE. POSITION OF THE GREASE SELECT
OR
SWITCH DETERMINES THE LENGTH OF TIME THA
T GREASE IS REMOVED FROM THE TRAP
.
0
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
44
46
48
50
52
54
56
58
60
62
64
66
68
70
OFF
ON
GREASE/OILS LIFT
PUMP
SOLIDS TRANSFER
PUMP
BACKWASH VALVE
SOLIDS SEPARATOR
UNIT
INPUT #0
INPUT #1
OUTPUT #0
OUTPUT #2
OUTPUT #3
OUTPUT #4
OUTPUT #5
GREASE REMOVAL
UNIT
INPUT #5
INPUT #6
"M
E
D
IU
M
"
G
R
E
A
S
E
S
E
LE
C
TO
R
S
W
IT
C
H
P
O
S
IT
IO
N
S
S
H
O
W
N
HEAVY GREASE
(SELECTOR SWITCH)
LIGHT GREASE
(SELECTOR SWITCH)
TIME CONTROLLER INPUT (GREASE TIME CLOCK)
MECHANIC'S CYCLE
(SHORT CYCLE)
FOG
ENFORCER
GREASE ENFORCER