Step 1
Connect track tube lengths using track joiners. To connect tubes with
track joiners insert track joiner into tube section until it stops. Insert
other end of track joiner into second tube until it stops. Using an ALLEN
WRENCH, tighten hexhead set screws on top & bottom of each tube until
flush with tube. Repeat process until both sections of track are assembled.
Step 2
Place locking collar on one end of fully assembled track length and tighten with
ALLEN WRENCH wrench. Slide on guide blocks for each shelving post. (If your system
requires a stationary middle unit, slide on locking collar then 2 guide blocks, then
second locking collar. Do not tighten inner locking collars at this point.) Lastly, place
locking collar on open end of tube and tighten with ALLEN WRENCH.
Repeat with second section of track.
PART 4: OVERHEAD TRACK ASSEMBLY
Step 1
Line up Shelving Units in a straight line in the area where the unit will be installed. Allow a minimum of 30” of open
aisle space for each system. Bumpers add a minimum of 3” to the width of the mobile units. Place stationary units on
the outside and middle (as needed**) and mobile units on the inside. To ensure smooth movement of mobile sections
take great care that all shelving units are aligned in a straight line.
Note:
Track lengths over 20 ft in length require a stationary unit in the middle of the system.
PART 5: INSTALL TRACK ASSEMBLY ONTO SHELVING UNITS
Step 2
Using two or more people
, raise one section of track assembly over tops of posts and starting on one end of shelving
run. Insert guide blocks into tops of posts. Continue to opposite end. Repeat process with second section of track.
Recheck shelving sections to ensure they are in straight alignment. To adjust for uneven floor surfaces, turn triangle
security feet on stationary posts (clockwise or counter-clockwise). For systems with stationary units in the middle
of the track, tighten down the locking collars surrounding these units.
Step 1
Lay completed shelving unit(s) with 74” posts on their side.
Step 2
With the opening of the bumper facing towards the bottom, slide bumper
over bottom of posts.
Step 3
Install 6" Casters (FTSC6 - CASTER MUST POINT INWARD AS SHOWN) through
openings in caster channels (FTSU18, FTSU21 or FTSU24).
Step 4
Install caster/caster channel assembly into 74” posts (FGN074C or FGN074G) until
caster fit is tight. If needed, use a rubber mallet and tap bottom of caster to drive
casters into posts. Repeat process for all mobile shelving units.
PART 3: CASTER ASSEBLY OR MOBILE POST ASSEMBLY.
Use 74" mobile posts.