30 – FNM® Series HPE – Installation Manual 

6

 

Wiring installation 

 

6.1

 

Electrical system and system specifications 

Proper installation of the engine to the electric system of the 
boat  is  the  responsibility  of  the  installer.  Carefully  read  the 
instructions in this chapter. 

In principle, it is appropriate to make sure that all the metallic 
components inside the boat have their frame connected to the 
ground continuity. 

Check that each electrical connection is made in a solid way 
and isolated from the outside. 

6.2

 

Battery and power supply 

Each engine installed on the boat needs a separate battery. In 
the  case  of  twin  installations  (two  engines),  make  sure  you 
have a battery for each engine. 

The specifications of the batteries are as follows: 

Characteristics 

Value 

Typology 

Suitable for marine use, 

excellent resistance to load 

and unload cycles 

Rated Voltage [V] 

12 

Capacity [Ah] 

>110 

Minimum pick-up current [A] 

>850 

Connectors 

Conical Clamps  

 

 

Do not use batteries with threaded,  nut ,or wings 
connector. 

 

To comply with the needs of correct operation of the engines it 
is  necessary  to  use  an  auxiliary  battery  prepared exclusively 
for  such  services  and  dimensioned  in  accordance  with  the 
number and the maximum load of the devices. 

 

Do  not  use  the  battery  engine  to  connect  services. 
The current absorption can cause malfunction of the 
engine. 

6.2.1

 

Cables diameter and length 

it is necessary to place the battery as close as possible to the 
engine to use short battery cables. 

The diameter of the battery cables must be selected according 
to  their length. Follow the table below: 

Cable length [m] 

Class 

Minimum thickness [mm

2

up to 0.9 

35 

from 0.9 to 1.4 

50 

from 1.4 to 1.8 

00 

70 

from 1.8 to 2.4 

000 

95 

from 2.4 to 3.1 

0000 

120 

from 3.1 to 3.6 

2* x 00 

2 x 70 

from 3.6 to 4.8 

2* x 000 

2 x 95 

from 4.8 to 6.1 

2* x 0000 

2 x 120 

* use two cables for each pole 

 

 

It  is  recommended  to  tin  solder  the  wires  to  the 
battery  to  ensure  the  durability  of  the  electrical 
contact. 

 

 

Battery  wear  reduces  the  starting  current,  it  is 
necessary  to  strictly  comply  with  specifications  to 
avoid starting problems and engine operation. 

6.2.2

 

Connection to the battery 

The  power  cables  from  the  battery  must  be  connected  as 
described below, as applicable: 

 

Failure to comply with the instructions for connecting 
the battery can lead to failure of  electric parts of the 
engine. Always follow the instructions provided. 

 

1.

 

Single-engine  installation,  single  battery

:  connect  the 

battery terminals to the engine: 

o

 

Positive

 (marked with +): to the pole B+ of the starter 

engine  of  the  engine  (see  paragraph3.3  –  Engine 
elements 
on page 8). 

o

 

Negative

 (marked with -): to the ground point on the 

engine wiring (see paragraph 3.3  Engine elements 
on  page  8).  Be  sure  to  remove  the  paint  to  ensure 
adequate  electrical  contact  between  the  cable  and 
the engine. 

 

Figure 33 - Wiring diagram for single-engine, single battery 

installation. 

2.

 

Single  engine,  two  batteries  installation  with  load 
dispatcher

, see diagram below: 

Engine battery 

Alternator

 

Ground point on the crankcase

 

Содержание HPE 110

Страница 1: ...Manual Marine Diesel Engines HPE Series HPE 40S 80 80SD 110 135 HPE 110JD 135JD HPE P 40 150 170 190 205 HPE 150JD 170JD 190JD 205JD HPE P 100 225 250 250H HPE 225JD 250JD HPE P 300 HPE P 300JD HPEL...

Страница 2: ......

Страница 3: ...o the engine compartment 21 5 1 Services connection points 21 5 2 Fuel circuit 21 5 3 Sea water circuit 22 5 4 Exhaust system 24 5 5 Hydraulic fluid circuit if present 25 5 6 Throttle 26 5 7 Propeller...

Страница 4: ...ii FNM Series HPE Installation Manual 8 6 Extension Kit 45 8 7 Mercathode Control Unit 45 9 Annexes 46...

Страница 5: ...conditions It is the responsibility of the boat manufacturer to select the appropriate engine inverter transom stern drive assembly including the right transmission speed and the right propeller for a...

Страница 6: ...ual is positioned together with the documentation accompanying the engine A copy of the form can also be obtained by contacting the After Sales Management at the above address or at the contacts below...

Страница 7: ...ine serial number position 1 3HPE 1 9HPE 2 4HPE On the right side of the crankcase bell housing connection or on the front side of the crankcase above the bell housing 3 0HPE On the crankcase front si...

Страница 8: ...otation of the flywheel Counterclockwise bell housing side For all rating data torque and power refer to the table in paragraph 2 5 on page 4 2 4 Work engines technical data HPEL 45 HPEL 80 HPEL 65 90...

Страница 9: ...90 less than the maximum power speed Limit of use 300 hours per year Subclass A1 Light Commercial Applications for Special Use For light boats in commercial applications for special use The guarantee...

Страница 10: ...er Rating Class Maximum Power HP kW rpm HPE P 300 A 295 217 4000 A1 B 250 184 4100 C 180 132 3 4000 D 130 95 4000 HPE P 250 A 250 184 4200 A1 B 225 165 4200 C 150 110 4200 D 100 73 5 4200 HPE P 190 A...

Страница 11: ...tronic control unit The set must be intact with no obvious signs of breakage or tampering The engine wiring and any extension cables must be integral with no cuts the Amphenol connectors between contr...

Страница 12: ...the engine lubrication oil 6 Diesel fuel exchanger reduces the temperature of the fuel in the return line to the exchanger 7 Air filter retains the impurities in the air intake 8 Double exchanger as a...

Страница 13: ...9 Figure 3 FNM HPEL 40S 80 80SD 110 110JD and HPEL 80 Figure 4 FNM HPE P 40 150 170 190 HPE 150JD 170JD 190JD and HPEL 65 90 1 2 3 4 5 6 7 9 10 11 12 13 14 15 16 17 18 19 19 20 21 1 2 3 10 7 9 11 12...

Страница 14: ...PE Installation Manual Figure 5 FNM HPE P 100 225 250 250H and HPE 225JD 250JD Figure 6 FNM HPE P 300 1 2 3 10 7 9 11 12 13 14 15 16 17 18 19 19 8 20 21 22 1 2 3 10 7 9 11 12 13 14 15 16 17 18 19 19 8...

Страница 15: ...FNM Series HPE Installation Manual 11 Figure 7 FNM HPEL 45 2 3 5 7 11 12 13 14 15 16 17 18 19 19 20 21...

Страница 16: ...realign the engine Use screws of adequate size to secure the engine to the supports All the forces exerted by water on the hull of the boat are transmitted to the engine through the side members and...

Страница 17: ...ion openings it is not possible to return within the indicated range because of weather conditions or the shape of the engine compartment it is necessary to check the difference between the outside te...

Страница 18: ...d bolts rather than screws with hexagon head because it ensures a greater fixing duration if you need to loosen the support in fact the stud bolt remains stationary in the longitudinal member Prevent...

Страница 19: ...for Mercruiser Bravo stern drive 2 Always use fibre washers indicated by the letter b in Figure 11 between the engine bell and transom 4 2 2 Engine positioning with Bravo Mercuiser stern drive After p...

Страница 20: ...13 Place the alignment bar as shown in Figure 14 The bar must cross the stern drive the grooved unit and the test centering indicated by the letter n in Figure 15 Figure 14 Inserting the alignment ba...

Страница 21: ...e alignment bar 20 Tighten the rear bolts between the engine and rear transom to 50 Nm 38 lb ft and the front ones that stop the anti vibration mounts to the engine as described in paragraph 0 on page...

Страница 22: ...s not mounted perfectly horizontally Check in the table of chapter 3 6 Installation angles on page 13 the maximum angle at which the correct operation of the engine is ensured 6 Disconnect the lifting...

Страница 23: ...two bells into contact then tighten the screws loosely so that it is possible to make further adjustments 6 Adjust the front anti vibration mounts bringing them into contact with the side members 7 Af...

Страница 24: ...is case the positioning and alignment of the engine can be carried out by checking only the engine and water jet propulsion unit angles of installation The selection and sizing of the model of constan...

Страница 25: ...er s instructions Follow the instructions below for connecting the tank Figure All connections must be positioned on the upper side of the tank The drain plug must be in the lowest point of the tank a...

Страница 26: ...required in some areas of the world where the proliferation of algae in the tank is common Install the additional filter between the engine filter and the tank The filter must be permanently attached...

Страница 27: ...ving parts of the engine Fasten the pipe with metal clamps Figure 23 Sea water intake Make sure that between the sea water intake and the sea water filter there is a shut off valve of the pipe and tha...

Страница 28: ...rive on page 14 to see the correct positioning of the stern drive assembly and the engine inside the engine compartment Figure 25 Engine exhaust in stern drive configuration In case of stern drive ins...

Страница 29: ...return of water to the exhaust when the engine is stopped The two circuits water and gas to be joined again in a lower point of the discharge line before the silencer Use a gooseneck exhaust geometry...

Страница 30: ...ure 30 Delivery a and return b of the power steering tube for Mercruiser Bravo stern drives The engines of the HPE range are provided with two different types of high pressure tubes for the hydraulic...

Страница 31: ...d transmission selected Once installed the throttle for the electrical connection see chapter 6 15 Electronic throttles electrical connection on page 39 it is necessary to 1 Adjust the stroke of the a...

Страница 32: ...eet the requirements described above can damage the engine control unit and cause a malfunction of the whole engine unit including transmission and voids the guarantee 5 6 4 Transmission control The t...

Страница 33: ...FNM Series HPE Installation Manual 29 Figure 32 Scheme of propellers rotation for twin installations...

Страница 34: ...as close as possible to the engine to use short battery cables The diameter of the battery cables must be selected according to their length Follow the table below Cable length m Class Minimum thickn...

Страница 35: ...wiring diagram below Two battery exchangers provide the possibility of using and charging the various batteries individually or in parallel connection by means of manual selection Figure 36 Wiring dia...

Страница 36: ...ates that the corresponding service is working properly In the engine normal mode of operation make sure that the lamps of all the fuses are lit and the fuses intact Orientation Name Rated Current A S...

Страница 37: ...or Trans Gear shows the current gear engaged in the transmission it requires an additional sensor Trans Temp indicates the current oil temperature in the transmission it requires an additional sensor...

Страница 38: ...ter Connector Tachometer 9 pins connected Figure 41 Speedometer Connector Speedometer 6 pins connected Figure 42 First Slave Tool Connector 5 pins There is also a round connector 5 pin that provides a...

Страница 39: ...RIM Fastom 9 Glows plugs kit Grey Yellow Glows plugs kit ECU 14 Stern drive oil level alarm Yellow Blue Drive Alarm Light Male STERN DRIVE Fastom 15 Rudder angle Red Yellow Instruments Free End 16 Sea...

Страница 40: ...ny kind will void the warranty and can cause engine damage Changes to the electrical system may cause danger to users of the boat In the case of engines with fly bridge system double panel carry out t...

Страница 41: ...ve and the Mercruiser mechanical throttle The drive has a limit switch for the LIMIT SWITCH trim operation that must not be confused with the TRIM SENDER sensor The limit switch shoe in the following...

Страница 42: ...ry to indicate GENERIC The calibration procedure that follows is mandatory for fly bridge installations During the procedure make sure that systems are connected as in Figure 46 sopra and that on both...

Страница 43: ...ensor works only with the additional speedometer instrument installed on the panel Connect the sensor as follows 1 Signal connect the additional yellow wire labelled as RAW WATER TEMP on the extension...

Страница 44: ...control unit ECU reads the throttle signal as voltage signal referred to the engine ground If the electronic control system does not correspond to the engine size it can lead to uncontrolled accelerat...

Страница 45: ...rned to position 1 5 There are no leaks of any fluid inside the engine compartment 7 2 Sea trial and Installation Form filling in The sea trial and the Installation Form filling in is mandatory before...

Страница 46: ...the Sea trial section then specify the parameters recorded by the EDR and by the other instruments Also indicate the maximum performance obtained during the trial 7 Complete the Conclusions and approv...

Страница 47: ...hen connecting the heating kit it is necessary to restore the coolant level in the tank to compensate the volume of liquid which is absorbed by the heater circuit It is also necessary to bleed the cir...

Страница 48: ...it return connection on 1 9 and 2 4 HPE base engines The delivery connection is oriented as in the image of Figure 57 Connect the 16 mm 8 5 in diameter aligned ends to the cut sleeve Connect the 16 mm...

Страница 49: ...he installation of an additional pulley for trapezoidal toothed belts with one or more grooves Engine Additional Pulley order code 1 3 HPE already supplied with engine 1 9 HPE 3 017 016 1 with adapter...

Страница 50: ...CU casing is grounded electrically so it must be isolated from the boat during the installation 8 5 Maretron NMEA2000 Control Unit The Maretron NMEA2000 Control Unit is used to provide the signal to s...

Страница 51: ...electronic format 1 Perforation template 1 049 067 1 Assembled CANBUS Instrument Panel 2 Perforation template 1 049 068 1 Separate 5 CANBUS Instrument Panel 3 Perforation template 1 049 069 1 Separate...

Страница 52: ...48 FNM Series HPE Installation Manual Page intentionally left blank...

Страница 53: ...FNM Series HPE Installation Manual 49 Page intentionally left blank...

Страница 54: ...50 FNM Series HPE Installation Manual Page intentionally left blank...

Страница 55: ...FNM Series HPE Installation Manual 51 Document 6 045 402 1 Marine Diesel Engines Installation Manual HPE Series Language EN Revision Changes Date 0 First issue 24 07 2015...

Страница 56: ......

Страница 57: ...Italia Tel 39 0972 715757 Fax 39 0972 715696 Email service fnm cmdengine com Spareparts spareparts fnm cmdengine com Web www fnm marine com Printed in Italy Order p n 6 045 402 1 Rev 0 del 24 07 2015...

Отзывы: