FMUSER INTERNATIONAL GROUP INC.
广州市汉婷生物技术开发有限公司
5
/
36
Chapter 2 Installation Guide
2.1 Acquisition Check
When user opens the package of the device, it is necessary to check items according to packing list.
Normally it should include the following items:
l
FUTV4502D DVB-S2 Modulator
l
User’s Manual
l
ASI Cable
l
Power Cord
If any item is missing or mismatching with the list above, please contact local dealer.
2.2 Installation Preparation
When users install device, please follow the below steps. The details of installation will be
described at the rest part of this chapter. Users can also refer rear panel chart during the installation.
The main content of this chapter including:
l
Checking the possible device missing or damage during the transportation
l
Preparing relevant environment for installation
l
Installing modulator
l
Connecting signal cables
l
Connecting communication port (if it is necessary)
2.2.1 Device’s Installation Flow Chart Illustrated as following
:
Connecting
Grouding
Wire and
Power
Cord
Acquisition
Check
Fixing
Device
Setting
Parameter
Running
Device
Connecting
Signal Wire