INSTALLING SCREEN

1.  Mount  screen  rod  brackets  on  left  and 

right side of firebox with #8 x 1/2" screws 

provided (see Figure 21, page 15).

2.  Slide round end of screen rod into rings 

at top of screen. Attach one push-on nut 

to end of rod before attaching last ring of 

screen.

3.  Insert round end of rod into rod bracket 

on left side of fireplace. 

4.  Mount flat end of screen rod with #10 x 

5/8" to center of smoke shelf (see Figure 

21, page 15).

5.  Install other screen rod in same manner.

installation 

Continued

Figure 20 - Grouting Brick

GROUTING INSTRUCTIONS

Material provided:

1  or  2  -  10  lb.  bags  of  cement  (depending 

on model)

1  or  2  -  10  lb.  bags  of  sand  (depending 

on model)
Material required:

1 - Piping bag

1 - Joints striker

1 - Heavy duty mixing bucket
1 - Trowel
1.  Moisten brick surface with damp sponge 

or  spray  bottle  just  prior  to  application. 

When bricks are wet, any excess grout 

mixture on bricks will easily wipe off.

2.  In a heavy duty mixing bucket, pour 4 ½ 

cups of water. Add 5 lbs. (half of a bag) of 

sand and 5 lbs (half of a bag) of cement. 

Mix together well using a power drill with 

mixing wand attachment to a yogurt like 

consistency. Not adding enough was can 

lead to grout falling out after burning.

3.  The overall length of piping bag should be 

about 16". If the bag is longer than 16", 

cut it down to size by removing end with 

larger  opening. This  will  make  the  bag 

easier to handle.

4.  Put 2 to 3 cups of grout mixture into piping 

bag making sure the smaller opening is 

downward and over a moist towel to avoid 

spilling. Place a wet towel over the bucket 

making sure it is directly on the surface of 

grout mixture. This will keep the mixture 

moist and it will not dry out before use.

5.  Begin  grouting  by  first  doing  a  “Filler 

Pass”. This is done by filling the joint about 

3/4 full with grout mixture. It is important 

to  work  with  only  6  bricks  at  a  time  so 

grout doesn't have time to set up before 

striking.

6.  Complete  a  “Finishing  Pass”  around  6 

bricks you just put filler pass around. This 

is done by slowly filling in remainder of the 

joint with a thick amount of grout mixture. 

Mixture should be a little higher than the 

brick surface.

7.  Using a trowel, remove excess grout mix-

ture by moving trowel in the direction of 

the joint. Grout mixture in the joint should 

now  be  flush  with  brick  surface.  If  not 

enough grout is applied into each space, 

grout may fall out after burning. 

8.  Using a joint striker, force grout mixture 

into  joint  and  sweep  back  and  forth 

until grout is smooth and round. If grout 

becomes  too  shallow,  add  more  grout 

mixture with piping bag and strike again.

9.  Continue procedure around each group of 

6 bricks until an entire panel is finished.

10. Using trowel, scrape in direction of joints 

to remove any grout that may have col-

lected  around  bricks  during  striking.  If 

desired, take a moist sponge and lightly 

sweep over bricks to remove any grout 

that may have gotten on bricks. DO NO 

PRESS HARD OR RUB IN A CIRCULAR 

MOTION. This  will  press  the  grout  into 

brick and turn brick a different color.

Allow 72 hours before operating 

fireplace.

Содержание WCM-48F

Страница 1: ...ndards or for use with a vent free gas log heater approved to ANS Z21 11 2 standard ThiswoodburningfireplacecomplieswithUL127 CAN ULC S610 M87 standard as a FACTORY BUILT APPLIANCE FOR CANADA The authority having jurisdiction such as the municipal building department fire department etc should be contacted before installation to deter mine the need to obtain a permit INSTALLER Leave this manual wi...

Страница 2: ...PRODUCTS LLC in combination with a FMI PROD UCTS LLC fireplace system Proper installation is the most important step in ensuring safe and continuous operation of the fireplace Consult the local building codes as to the particular requirements concerned with the installation of all factory built fireplaces WARNING Do not install a fireplaceinsertinthisboxunless the manufacturer s instructions with ...

Страница 3: ...r Using Straps Provided Hearth Spacer Required for Combustible Floor 0 to Bottom 12 Min Each Side Hearth Extension 72 X 20 Outside Air Access Location 1 5 Airspace Back and Sides 2 Chimney Airspace Clearance to Combustible Material No Combustible Material on Front Face Except for Mantel Applications Gas Line Access Location 18 Min to Perpendicular Wall Safety Continued WARNING Alwaysleaveglass doo...

Страница 4: ...y at the level of the flue gas outlet see Figure 15 page 9 Framing 1 Frame the opening for the fireplace using the dimensions shown in Figures 1 and 2 2 If the fireplace is to be installed directly on carpeting tile other than ceramic or any combustible material including wood flooring the fireplace must be installed 60 875 65 7 71 5 76 375 31 625 Secure Fireplace To Hearth Spacer Using Straps Pro...

Страница 5: ...Seal Gap Fireplace Front Ember Protector Fireplace Front Raised Hearth Fireplace Front Elevated Ember Protector Ember Protector Seal Gap Hearth Extension Mantels A mantel may be installed if desired see Figure 4 Woodwork such as wood trims mantels or any other combustible material projecting from the front face must not be placed within 12 of the fireplace opening Combustible materials above 12 an...

Страница 6: ...pipe sections are locked together When installing double wall snap lock chimney to gether it is important to assure joint between chimney sections is locked Check by pulling chimney upward after locking Chimney will not come apart if properly locked It is not necessary to add screws to keep chimney together exception see Figure 9 page 8 Figure 5 Outside Air Kit Secure to Collars with Metal Tape Sc...

Страница 7: ...18 24 36 48 4 3 8 16 3 8 ELBOW SET ONLY 9 3 4 25 1 2 1 12 3 4 30 3 4 1 15 34 3 4 1 18 40 1 1 21 1 4 46 1 4 1 23 3 4 49 1 4 1 1 27 3 4 56 3 4 1 30 60 3 4 1 1 33 66 1 36 71 1 1 38 1 4 75 2 41 1 4 80 1 4 1 1 1 45 86 3 4 2 46 3 4 89 1 2 1 1 1 51 97 1 1 53 1 4 101 2 56 1 4 106 1 4 2 59 1 4 111 1 2 1 1 1 61 3 4 115 1 2 1 2 64 3 4 120 3 4 1 2 68 1 4 127 2 1 70 130 1 1 2 74 1 4 137 1 2 1 2 1 76 3 4 141 1 ...

Страница 8: ... Screws or Staples Min of 8 Firestop Spacer Screws or Staples Min of 8 Penetrating roof To maintain a 2 clearance to pipe on roof with a pitch a rectangular opening must be cut 1 Determine center point through which pipe will penetrate roof 2 Determine center point of roof Pitch is the distance the roof drops over a given span usually 12 3 Use roof opening chart Figure 12 to determine correct open...

Страница 9: ...ainst open edge of flashing see Figure 14 Apply waterproof caulk around perimeter of collar to provide a proper seal Figure 14 Storm Collar Chimney Pipe Waterproof Caulk Storm Collar Flashing Terminations Spark Arrestor Fireplace system must be terminated with listed round top or chase terminations In any case refer to installation instructions supplied with termination CAUTION Do not seal open in...

Страница 10: ...10 Foot Rule Seal Opening with Refractory Cement Outside of Fireplace Gas Line Conduit Repack Insulation Incoming 1 2 Black Iron Pipe Side Firebrick Finished Side Provide Enough Threaded End for Fitting Connection Figure 18 Gas Line Installation Optional Gas Line Installation Gas line hook up should be done by your sup plier or a qualified service person Note Before you proceed make sure your gas ...

Страница 11: ...ing Brick Brick Stamped Number Location Brick Housing Flanges Brick Installation IMPORTANT Installationofbrick should be done after the fire place is placed in a permanent location Each brick housing is stamped with a number full size bricks are not stamped These num bers will help identify the brick when installing It is important to install these bricks exactly as instructed Press brick firmly i...

Страница 12: ... 0 0 2 S 0 0 2 S 0 0 8 S 0 1 9 S 0 1 9 S 0 1 9 S 0 2 3 S026 S027 S028 S029 S030 F U L L F U L L F U L L F U L L S 0 3 4 F050 F049 F049 F049 F049 F049 F049 F049 F049 F049 F055 F056 F053 F055 F055 F055 S021 or S006 S012 S025 S024 F054 S042 F051 F054 F050 S041 S039 S038 S037 S001 S003 S007 S022 S040 S001 S003 F U L L F U L L F U L L F U L L F U L L F U L L F U L L S 0 0 6 F U L L F U L L F U L L F U ...

Страница 13: ... S014R S014W 1 S015R S015W 1 S016R S016W 1 S019R S019W 3 S020R S020W 11 S021R S021W 1 S023R S023W 1 S024R S024W 1 S025R S025W 1 S026R S026W 1 S027R S027W 1 S028R S028W 1 S029R S029W 1 S030R S030W 1 REAR UPPER REFRACTORY RED IVORY QTY FULL 112140 02 FULL 112140 06 24 F054R F054W 3 S002R S002W 1 S005R S005W 2 S006R S006W 2 S007R S007W 3 S008R S008W 1 S011R S011W 1 S013R S013W 1 S014R S014W 8 S015R S...

Страница 14: ...e into piping bag making sure the smaller opening is downward and over a moist towel to avoid spilling Place a wet towel over the bucket making sure it is directly on the surface of grout mixture This will keep the mixture moist and it will not dry out before use 5 Begin grouting by first doing a Filler Pass This is done by filling the joint about 3 4 full with grout mixture It is important to wor...

Страница 15: ...ptional Ash Lip Kit Rail installation 1 Remove screws securing top face to firebox see Figure 22 2 Align holes on rail to be installed at top and replace screws Note Door rails are identical until spring clips are in place 3 Using remaining door rail as a template place along front row of bricks at bottom making sure rail front surface is flush with fireplace bottom face surface Mark hole centers ...

Страница 16: ...rs must be fully opened before starting fire This will provide sufficient combustion air and maintain safe temperatures in firebox Figure 26 Bi Fold Glass Doors Doors Fully Closed Fireplace Front Fireplace Front Doors Fully Opened Installing Glass Doors After spring clips have been installed some adjustments may be needed Install the doors using the following steps 1 With bi fold doors completely ...

Страница 17: ...laces ANSI Z21 60 orAmericanGasAssociationdraftrequirements for Gas Fired Log Lighters for Wood Burning Fireplaces Draft NO 4 dated August 1993 If you wish to install an unvented vent free gas log set only unvented gas log sets which have been found to comply with the standard for unvented room heaters ANSI Z21 11 2 are to be installed in this fireplace damper handle operation The damper handle op...

Страница 18: ...y Parts Bi Fold Glass Masonry Door BDMO48E 48 Ebony BDMO48G 48 Pewter BDMO48C 48 Oiled Bronze Double Wall Pipe 12 12DM 18 12DM 24 12DM 36 12DM 48 12DM 12 12HT 18 12HT 24 12HT 36 12HT and 48 12HT 30 Offset and Return 30E 12DM and 30E 12HT Grate 109496 01 for F48 Series 123277 01 for WCM 48F Series Ember Protector 20093 Optional Outside air kit for floor installation ak4f Optional Outside Air Kit fo...

Страница 19: ... Parts Continued SQUARE CHASE TOP TERMINATION STL 12D Round ToP TErminations RLT 12D and RLT 12HT Optional ASH LIP KIT Bricks AL48 Red Brick AL48I Ivory Brick Optional Hearth Spacer HS48 24 Round Woodnook DHR 24 Screen 118115 01 Rod 110146 02 Push On Nut 11418 ...

Страница 20: ...122272 01 Rev D 01 10 2701 S Harbor Blvd Santa Ana CA 92704 1 866 328 4537 www fmiproducts com ...

Отзывы: