background image

OWNER’S OPERATION AND INSTALLATION MANUAL

INDOOR WOOD BURNING (V)GCAT42/50(H)A SERIES   

INDOOR/OUTDOOR WOOD BURNING (V)JCAT42/50(H,S) 

SERIES FIREPLACES WITH INSULATION

PFS

®

US

C

ICC-ES #ESR-2542

For more information, visit www.fmiproducts.com

These models meet the EPA Wood Burning Fireplace 

Program Phase 2 emission level. NOTE: To ensure proper 

fireplace operation, the catalyst should be replaced at a 

minimum of 3 years and a maximum of 5 years.

SAVE THIS BOOK

This  book  is  valuable.  In  addition  to  instructing  you 

on how to install and maintain your appliance, it also 

contains information that will enable you to obtain re

-

placement parts or accessory items when needed. Keep 

it with your other important papers.

This fireplace is approved for use as a wood burning 

fireplace or for use with a vented gas log approved to

 

ANS Z21.60 and Z21.84 standards. 

This  wood  burning  fireplace  complies  with  UL127-CAN/

ULC-S610-M87 standard as a FACTORY BUILT FIREPLACE.
FOR CANADA: The authority having jurisdiction (such 

as the municipal building department, fire department, 

etc.) should be contacted before installation to deter

-

mine the need to obtain a permit.
INSTALLER: Leave this manual with the appliance.

CONSUMER: Retain this manual for future reference.

Содержание GCAT42/50A

Страница 1: ...install and maintain your appliance it also contains information that will enable you to obtain re placement parts or accessory items when needed Keep it with your other important papers This firepla...

Страница 2: ...llation of the fireplace read these instructions through completely ThisFMIPRODUCTS LLCfireplaceandits componentsaresafewheninstalledaccord ing to this installation manual Unless you use FMI PRODUCTS...

Страница 3: ...COMBUSTIBLE MATERIAL ON FACE MINIMUM 18 TO PERPENDICULAR SIDEWALL HEARTH EXTENSION 66 X 20 2 CHIMNEY AIRSPACE CLEARANCE TO COMBUSTIBLE MATERIAL 42 23 1 2 25 1 8 22 3 4 30 1 2 29 4 3 8 15 3 4 5 8 17 5...

Страница 4: ...O COMBUSTIBLE MATERIAL COMBUSTIBLE WALL BOARD NO COMBUSTIBLE MATERIAL ON FACE 0 TO BOTTOM OUTSIDE AIR 11 2 AIR SPACE BACK AND SIDES GAS LINE KNOCKOUTS 12 EACH SIDE MINIMUM 18 TO PERPENDICULAR SIDEWALL...

Страница 5: ...Consider a location where fireplace will not be affected by drafts air conditioning ducts windows or doors 3 A location that avoids cutting of joists or roof rafters will make installation easier 4 An...

Страница 6: ...arth extension from shifting and seal gap between fireplace frame and hearth extension with a noncombustible material see Figure 5 WARNING Hearthextension is to be installed only as shown in Figure 4...

Страница 7: ...ons Figure 7 Outside Air Kit Secure to Collars with Metal Tape Screws or Straps Min of 1 4 x 20 in size Air Inlet Location Must Allow For Bushes or Snow Vent Hood Required for Wall Installation Air In...

Страница 8: ...pipe sections are locked to gether When installing double wall snap lock chimney together it is important to assure the joint between the chimney sections is locked Check by pulling chimney upward af...

Страница 9: ...igure 13 Firestop Spacer with Attic Space Above Ceiling Existing Ceiling Frame Firestop Spacer Screws or Staples Min of 8 Firestop Spacer Screws or Staples Min of 8 PENETRATING ROOF To maintain a 2 cl...

Страница 10: ...12F 10DM Determine the flashing to be used with the roof opening chart Slide flashing over pipe until base is flat against roof Replace as many shingles as needed to cover exposed area and flashing ba...

Страница 11: ...2 Min 10 3 Min 2 Min 3 Min Level of Flue Gas Outlet Figure 19 18 Foot Rule Terminations Spark Arrestor The fireplace system must be terminated with the listed round top or chase terminations In any ca...

Страница 12: ...ey should be positioned a distance apart as shown in Figure 20 4 Install rear refractory panel This panel has a top and bottom To determine which is which match up the pattern on the rear panel with t...

Страница 13: ...la tion from gas line conduit sleeve Save insulation for reuse Replace screws 3 Run a 1 2 black iron gas line into fireplace through the rear at gas line conduit sleeve if usingaraisedplatform addheig...

Страница 14: ...g Fireplaces ANS Z21 60 or Z21 84 and shall also be installed in accordance with the National Fuel Gas Code ANSI 7223NFPA 54 latest edition If you wish to install an unvented vent free gas log set onl...

Страница 15: ...si tion making sure top pins slide into door track Door is installed when top door pin snaps into spring clip 2 Repeat step 1 for remaining door If you find doors do not close properly or do not appea...

Страница 16: ...built or if combustion air gate is not completely open The following tips should be followed to assure that both the fireplace and glass door retain their beauty and function properly Both the flue d...

Страница 17: ...d with petroleum products leaves paper products cardboard or salt driftwood Refer to your FMI PRODUCTS LLC Home owner s Guide included with your fireplace for proper fire building technique and ash re...

Страница 18: ...els that have not met this emissions level Exposure to smoke has been associated with respiratory illness and other health problems Models that have lower smoke emissions may reduce your risk PHASE 2...

Страница 19: ...LACEMENT PARTS If this product is missing a part or has a broken component please do not return it to the store Call FMI PRODUCTS LLC at 1 866 328 4537 to answer questions and replace parts under warr...

Страница 20: ...www fmiproducts com 125655 01B 20 PARTS MODELS V GCAT42 50 H A SERIES AND V JCAT42 50 H S SERIES 1 21 20 5 6 7 10 9 11 12 13 16 17 15 14 8 24 23 3 25 18 2 22 19 4 26 27 28 29 30...

Страница 21: ...sh Box Assembly 1 20 Inner Dome Assembly 1 21 Smoke Shield 1 22 Damper Control Bracket 1 23 109457 02 Screen 42 2 109457 01 Screen 50 2 117556 02 Screen 42 Stainless 2 117556 01 Screen 50 Stainless 2...

Страница 22: ...www fmiproducts com 125655 01B 22 PARTS MODELS V GCAT50 H A SERIES AND V JCAT50 H S A SERIES Picture may vary from actual 1 2 5 3 4 6 6...

Страница 23: ...1 Left Stacked 42 Natural White 1 125836 02 Left Herringbone 42 Red 1 125836 01 Left Herringbone 42 Natural White 1 125839 02 Left Stacked 50 Red 1 125839 01 Left Stacked 50 Natural White 1 125842 02...

Страница 24: ...BDG42B 42 Brushed Brass BD50 50 Black BD50P 50 Platinum BD50B 50 Brushed Brass DOUBLE WALL PIPE 12 12DM 18 12DM 24 12DM 36 12DM 48 12DM 12 12HT 18 12HT 24 12HT 36 12HT and 48 12HT 30 OFFSET AND RETUR...

Страница 25: ...6 12 Pitch V12F 10DM 6 12 to 12 12 Pitch ACCESSORIES Continued SQUARE CHASE TOP TERMINATION STL 12D AND STL 12DMP BLACK ROUND TOP TERMINATIONS RLT 12D AND RLT 12HT STORM COLLAR SC2 1 FIRESTOP SPACER...

Страница 26: ...______________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ____...

Страница 27: ...______________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ____...

Страница 28: ...125655 01 Rev B 07 12 2701 S Harbor Blvd Santa Ana CA 92704 1 866 328 4537 www fmiproducts com...

Отзывы: