The chimney support section is a 4-strap 12” length of pipe.  A 
chimney support is required at the 30-foot level above the 
fireplace after a straight chimney run (see figure 17). This 
support is designed to relieve the extra weight load on the 
fireplace and elbows when high chimneys are installed. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

PENETRATING THE ROOF: 

 
To maintain a 2-inch clearance to the pipe on the roof with a 
pitch, a rectangular opening must be cut. 
 
STEP 1: Determine the center point through which the pipe 
will penetrate the roof. 
 
STEP 2: Determine the pitch of the roof.  Pitch is the distance 
the roof drops over a given span, usually 12 inches.  A 6/12 
pitch means that the roof drops 6 inches for each 12 inches 
one measures horizontally down the roof. 
 
STEP 3: Use the roof-opening chart (see figure 19) to 
determine the correct opening length and flashing required. 
 
STEP 4: Remove the shingles around the opening measured 
and cut out this section. 
 
STEP 5: Add the next sections of the pipe until the end 
penetrates the roofline.  Check to see that the proper 
clearances are maintained. Extend chimney by adding sections 
of double wall pipe until pipe is a minimum of 30 inches 
above the highest point of the roof cutout.  Termination and 
chimney must extend a minimum of 36 inches above the 
highest point where it passes through roof. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Figure 16          FIRESTOP INSTALLATION 

 IMPORTANT:

If an exposed portion of chimney is 

greater than four feet above the roofline, use support wires 
to keep the chimney secured.  The support wires may be 
attached to the outer pipe of the chimney with screws 
provided the screws do not penetrate the inner flue pipe. 

Figure 17         SUPPORT SECTIONS 

 

 

 

 

PITCH

SLOPE

OPENING "A" MAX

USE FLASHING

(degrees)

(inches)

MODEL NO.

FLAT

0

17

V6F-8DM

0 - 6/12

26.6

19 - 1/8

V6F-8DM

6/12 - 12/12

45.0

24 - 1/4

V12F-8DM

Figure 18       TYPICAL INSTALLATION 

Содержание 42C

Страница 1: ...ndard A DESA hood must be installed when using a vent free gas log set See accessories on pg 11 WARNING ALWAYS LEAVE GLASS DOORS FULLY OPENED OR FULLY CLOSED WHEN OPERATING THIS FIREPLACE DESA INTERNATIONAL 2701 INDUSTRIAL DRIVE P O BOX 90024 BOWLING GREEN KY 42102 9004 www desatech com PN 54016 REV B 10 00 SAVE THIS BOOK This book is valuable In addition to instructing you on how to install your ...

Страница 2: ...ALLING THE FIREPLACE PG 3 8 HEARTH EXTENSION PG 4 9 OUTSIDE AIR KIT PG 4 10 GAS LINE INSTALLATION PG 4 11 VENT FREE GAS LOG INSTALLATION PG 5 12 COLD CLIMATE INSTALLATIONS PG 5 13 CHIMNEY PIPE PG 6 7 14 PENETRATING THE ROOF PG 8 15 FLASHING INSTALLATION PG 9 16 STORM COLLAR INSTALLATIONS PG 9 17 TERMINATIONS PG 9 18 FINISHING THE FIREPLACE PG 10 19 MANTEL CLEARANCES PG 10 17 REPLACEMENT AND ACCESS...

Страница 3: ...ortant step in ensuring safe and continuous operation of this fireplace SELECTING LOCATION To determine the safest and most efficient location for your fireplace consider the following guidelines The location must allow for all proper clearances see page 3 The location should be in a place where the fireplace will not be affected by drafts such as air condition ducts windows or doors A location th...

Страница 4: ...e level of the fireplace and shim with sheet metal if necessary STEP 5 Before securing fireplace to prepared framing the ember protector provided must be placed between hearth extensions not supplied and under the bottom front edge of the fireplace to protect against glowing embers falling through If the fireplace is to be installed on a raised platform a Z type ember protector not supplied must b...

Страница 5: ...IT MODELS AK4 OR AK4F The outside air kit must be installed during the rough framing of the fireplace due to the nature of its location Outside combustion air can be accessed through an exterior wall Model AK4 or a vented crawl space Model AK4F See figure 6 and Accessories on page 11 Avoid installing outside air eyebrow in areas where inlet opening may be blocked by snow bushes or other obstacles ...

Страница 6: ...t be installed when using an unvented gas log set see accessories on page 11 VENTED GAS LOG INSTALLATION If you install a decorative gas appliance vented gas log the decorative gas appliance must comply with the Standard for Decorative Gas Appliance for Installation in solid fuel burning fireplace ANS Z21 60 1996 Z21 84 or RGA 2 72 and shall also be installed in accordance with the National Fuel G...

Страница 7: ...e wall pipe segments planned for maximum adaptability to individual site requirements Actual lengths gained lineal gain after fitting overlaps must be taken into consideration see figure 12 Each double wall chimney section consists of a galvanized outer pipe a stainless steel inner flue pipe and a wire spacer The pipe sections must be assembled independently as the chimney is installed When attach...

Страница 8: ...as required by most codes When the double wall pipe passes through a framed opening into an attic space the firestop must be place into the attic floor as in figure 16 When the pipe passes through a framed opening into a living space above the firestop must be placed onto the ceiling from below as shown in figure 16 1 elbow set 16 to 60 ft system height 2 elbow sets 30 to 60 ft system height Figur...

Страница 9: ...ure 19 to determine the correct opening length and flashing required STEP 4 Remove the shingles around the opening measured and cut out this section STEP 5 Add the next sections of the pipe until the end penetrates the roofline Check to see that the proper clearances are maintained Extend chimney by adding sections of double wall pipe until pipe is a minimum of 30 inches above the highest point of...

Страница 10: ...lashing or chase and ETL 8DM for chase style termination only Figure 21 shows an RTL 8DM round top termination FOLLOW THE INSTALLATION INSTRUCTIONS PROVIDED WITH THE TERMINATION BEING USED CHASE INSTALLATIONS Instructions for chase installations are included with the chase style termination chosen In a multiple chase installation be sure to provide adequate distance between terminations to prevent...

Страница 11: ...e placed at least 9 inches above the opening of the fireplace see figure 25 Combustible materials above 9 inches and projecting more than 1 inches from the front face of the fireplace must be place at least 12 inches above the fireplace opening Ref NFPA std 7 3 3 3 Mantels or any other combustible material may butt up to the side of the black metal face of the fireplace The clearances from the sid...

Страница 12: ...n visit www desatech com Desa International 2701 Industrial Drive P O Box 90024 Bowling Green KY 42102 9004 www desatech com 800 323 5190 ACCESSORY PARTS REPLACEMENT PARTS CONTACT YOUR LOCAL DEALER CONTACT YOUR LOCAL DEALER ...

Отзывы: