EN
GL
ISH
10
AS
SE
M
BL
y
OF
T
hE
B
-S
AF
E S
yS
TE
M
Disconnect the Pigtail of the second Front Line and thread it
slowly through the ring of the Front Connection Line.
Disconnect the second Front Line from the B-Safe Pigtail.
Connect the second Front Line with a Lark‘s Head below the
ring of the Front Connection Line. Tension both lines to tighten
the connection.
Connect the Front Pigtail of the second Front Line. Both Front
Lines are now ready.
Unwind both 5,1 m B-Safe Lines from the cardboard winder.
These lines are already connected and build one 10 m B-Safe
Line. Connect the B-Safe Pigtail and the 10 m B-Safe Line with
a double loop.
08 ASSEMBLy OF ThE
B-SAFE SySTEM
08.01 Conversion of the CONNECT2 Control Bar from
4 lines Frontline Safety to 5 lines B-Safe System
The CONNECT2 is delivered as a 4-line control bar with FLS
(Frontline Safety System). Take the B-Safe line set out of the
CONNECT2 bar bag.
Unwind the flying lines until you reach the Front Connection
Line.
Open the connection of the first Front Connection Line and
the Front Line. Thread the Front Line slowly out.
Attention:
thread all lines slowly to avoid damage caused by
friction!
Connect the first Front Line with a double loop to the Front
Connection Line.
The trim is necessary to ensure an equal
total line length.
Thread the first Front Line slowly through the loop and ten-
sion both lines to ensure a tight connection.
Содержание CONNECT2
Страница 1: ...USER MANUAL CONNECT2 EN...