AQ 002 Rev.00 Issued/Verify/Approval M. Garofolo 13/july/02
Identification: MM 002 Rev 01
Page: 5 of 26
Date: 20/april/2005
Issued: M. Fiorindo
Verify: R.Ciotti
Approval: R. Ciotti
Revisions description:
Updated manual
Storch CL, HS, S
Maintenance Manual
(for Rotax 912 UL/S, 914 UL and
Jabiru 2200 version)
1. ROUTINE MAINTENANCE
1.1 GENERAL
No other factors are quite important for the
safety
and reliability of, the aircraft and its components as a
regular and diligent attention to the routine maintenance steps carried out within the recommended
intervals.
The same applies for a prompt corrective action , introduced for all minor troubles found during the
aircraft in-service life.
This chapter contains the maintenance instructions and checks to be performed on the air-frame,
equipments and engine
.
For detailed instructions applicable to the engine and its components (e.g. disassembly, cleaning,
inspection, testing, repair, lubrication, torque loads and reassembly), the operator should refer to the
Operator's Manual and Spare Parts List, last issues
,
published by engine manufacturer.
1.2 MAINTENANCE SCHEDULE
The maintenance schedule for STORCH is based upon 10 inspections to be accomplished within the
following limits.
PRE--FLIGHT INSPECTION: to be accomplished before each flight.
DAILY INSPECTION: to be accomplished daily, before beginning the flight
activity.
10-HOURS INSPECTION: to be accomplished after 10 flight hours.
20-HOURS INSPECTION: to be accomplished after 20 flight hours.
50-HOURS INSPECTION: to be accomplished after 50 flight hours.
100-HOURS INSPECTION: to be accomplished after 100 flight hours
.
150-HOURS INSPECTION: to be accomplished a after 150 flight hours.
200-HOURS INSPECTION: to be accomplished after 200 flight hours.
300-HOURS INSPECTION: to be accomplished after 200 flight hours.
ANNUAL INSPECTION: to be accomplished once a year independently of flight hours totalised.
GENERAL OVERHAUL: to be accomplished an airframe and engine at the manufacturer’s facilities after-
150 flight hours.