FLUXANA VITRIOX GAS 2XRF Скачать руководство пользователя страница 12

 

 

 

 

 

 

    FXBA‐0096‐10 

 

                 

12 / 18

 

 
 

6.0  Copying an Application 

 
This can be used to shorten the creation of a new application, or to create a backup of an 
existing application on a free memory slot. 
 
1. Load a stored application, e.g. Appl. 1 ‐ (see function key Load). 
2. Enter the new application number in Appl (

do not press

 Load). 

3. Press Modify, change the desired values. 
4. Press Save. 

 

7.0  Changing the fusion times during the running 
application  

 
The device allows to change the times in the application steps preheating, prefusion, main 
fusion 1, main fusion 2, pouring and cooling individually during the running application. This 
enables the user to observe the melting process and intervene depending on the progress. 
In the Mainfusion 2, the time should 

ALWAYS

 be 240 sec, since the mould burners are set to 

optimum temperature before pouring. 
 
Example for shortening the Mainfusion time: 
 
The device is currently in the Mainfusion 1, 

Target = 240 sec

. After inspection, the main 

fusion should end after 180 seconds:  
 
Press Target time 240 and enter the new time, e.g., 180. Confirm with ENTER. 
 
If the actual time is ≤ Target time, this application step stops and the next step begins. 
 
Increasing the Mainfusion time works in the same way. 
 
According to the examples above, all displayed times in the different application steps can 
be changed during the process. 
 
If the entries need to be stored for future use they must be saved, this must be done after 
the application ends (see Function key Modify). Unsaved changes will be lost after switching 
off the device. 
 
If the agitating times (on or off) are set to 10 s, it must be ensured that the total time 
(preheating, prefusion and main fusion 1 & 2) can be devided by 20. 
This is to ensure that after the last agitating cycle, the sample is poured directly onto the 
heated mould. 
 
 

Содержание VITRIOX GAS 2XRF

Страница 1: ...XANA GmbH Co KG Borschelstr 3 47551 Bedburg Hau Germany Tel 49 2821 48011 10 Fax 49 2821 48011 99 info fluxana de www fluxana com Service and Support FLUXANA GmbH Co KG Borschelstr 3 47551 Bedburg Hau...

Страница 2: ...unction key Load 5 1 3 Function key Modify 5 1 4 Function key Settings 6 0 Copying an Application 7 0 Changing the fusion times during the running application 8 0 Application with low temperature 9 0...

Страница 3: ...mbar Minimum maximum gas pressure 200 500 mbar 200 500 mbar 200 500 mbar Recommended oxygen pressure 2 bar 2 bar 2 bar Maximum oxygen pressure 2 bar 2 bar 2 bar Maximum air consumption 1 m3 h 2 m3 h 3...

Страница 4: ...ar view 1 Gas connection hose fitting 9 mm outer diameter 2 Air pressure gauge 3 Air connection hose fitting 9 mm outer diameter 4 Oxygen connection hose fitting 6 mm outer diameter 5 Power connection...

Страница 5: ...FXBA 0096 10 5 18 2 2 Front view 1 Touch display 2 Emergency stop button 3 Machine power switch Main switch Power 4 USB port 1 2 3 4...

Страница 6: ...FXBA 0096 10 6 18 2 3 Top view 4 Stations 1 Crucible burner 2 Mold burner 3 Crucible 4 Mould 5 Ceramic bar for mould 6 Ceramic stop for mould 2 1 3 4 5 6...

Страница 7: ...ressed air to the Air hose fitting with a hose clamp Inner diameter of the hose for compressed air is 9 mm Air pressure min 4 bar max 8 bar Connect the oxygen to the Oxygen hose fitting with a hose cl...

Страница 8: ...y the pilot burner After pouring the melt out of the crucible into the moulds they are cooled first with low pressure air cooling 1 and then cooled in the next two steps with increasing pressure The f...

Страница 9: ...d after pressing the Power button 5 1 Function Keys Appl Application can be selected Station stations can be switched on and off Modify Applications can be changed Load selected application is read St...

Страница 10: ...automatically loaded when the device is switched on After selecting the application type application number 0 9 and confirm with ENTER read application with Load 5 1 3 Function key Modify With Modify...

Страница 11: ...e new window select Admin enter the password and confirm with Enter Press Save to store all new entries these are retained even after the device has been switched off Exit this page with Menu 5 1 4 Fu...

Страница 12: ...um temperature before pouring Example for shortening the Mainfusion time The device is currently in the Mainfusion 1 Target 240 sec After inspection the main fusion should end after 180 seconds Press...

Страница 13: ...gely individual adaptation to different requirements In the preheating step e g a low temperature can be set to e g to dry the crucible contents or to perform an oxidation Thereafter from prefusion on...

Страница 14: ...ds Mainfusion 2 240 seconds Agitating off 10 seconds Agitating on 10 seconds Pouring 7 seconds Cooling complete 360 seconds 60 240 60 Application 1 Preheating 240 seconds Prefusion 540 seconds Mainfus...

Страница 15: ...ntric upwards out of the motor plate Put round belt on the motor plate and put the eccentric back in the holes of the motor plate Now place the round belt over the grooves of the drive pulleys Figure...

Страница 16: ...y to find out if the toothed belt is in the right position If not adjust until everything fits Now tighten the screws slightly and insert the eccentric into the motor plate If the shafts rotate easily...

Страница 17: ...in disregard of instructions furnished by the producer In no event shall damages for defective goods exceed the purchase price of the goods and the producer shall not be liable for incidental or cons...

Страница 18: ...directives by FLUXANA GmbH Co KG Borschelstr 3 47551 Bedburg Hau This declaration relates exclusively to the machinery in the state in which was placed on the market and excludes components which are...

Отзывы: