
Operation
Testing
the
ESU
3
3-7
Supply
Mains
Dispersive
Active
Main
Test
Load
ESU
RF303
ESU Active
HF
Meter
ESU Dispersive
Earth
YEL
BLU
BLU
M
CQM
exz06.eps
Figure 3-1. Generator Output Test
Basic Contact Quality Monitor (CQM) Test
This test of the contact quality monitor uses the Analyzer’s test load to
simulate a patient’s skin resistance in contact with the dual element
neutral/dispersive electrode pad.
Note
Perform this test on electrosurgical units without energizing the
generator output. Do not connect the ESU active electrode to the
Analyzer during this test.
The CQM (REM) test is intended for the neutral/dispersive electrode of
monopolar ESUs equipped with a contact quality monitor. The
neutral/dispersive electrode is actually two separate pads attached to the
patient’s skin. The CQM (REM) circuit issues an alarm only if the patient
loses contact with one or both of the two pads. See Figure 3-2 for a diagram at
the end of this section.
Содержание RF303 Operators
Страница 8: ...RF303 Operators Manual iv...
Страница 10: ...RF303 Operators Manual vi...
Страница 12: ...RF303 Operators Manual 1 2...
Страница 24: ...RF303 Operators Manual 1 14...
Страница 26: ...RF303 Operators Manual 2 2...
Страница 38: ...RF303 Operators Manual 3 2...
Страница 64: ......
Страница 66: ...RF303 Operators Manual A 2...
Страница 68: ...RF303 Operators Manual B 2...