Fluke 700HTP-2 Скачать руководство пользователя страница 2

Features  

 

 

gsp001.eps 

No. 

Item 

Function 

 

Master 
Instrument Port 

Port for Fluke 700 Series Pressure 
Module, 1/4-inch NPT female. 

 

Test Pressure 
Port 

Port for pressure instrument under 
test, 1/4-inch NPT female. 

 

Pressure Relief 
Valve Port 

Port for an optional Fluke 700PRV-1 
Pressure Relief Valve (plugged). 

 

Vernier Fine 
Adjustment Knob 

Lets you adjust the applied pressure 
in small increments. 

 

Hydraulic Fluid 
Reservoir 

Holds 100 cc of mineral based 
hydraulic oil, distilled water, or 
hydraulic oil. 

 

1/4-inch NPT Tee 
Fitting 

For master and test ports. 

 

Handle Limiter 

Limits the travel of the handles. 

 

Reservoir Filler 
Cap 

Cap which seals the hydraulic fluid 
reservoir. Install before you pump. 

 

Pressure Bleed 
Knob 

Lets you release pressure in small 
increments. 

 

Reservoir Nut 

Remove nut to clean reservoir. 

 

 

gsp002.eps 

Figure 1. Test Configuration 

How to Operate the Test Pump

 

W

 

Warning 

To prevent a violent release of pressure, open the 
Pressure Bleed Knob (item 

) very slowly

 

before you 

disconnect pressure lines. Do not connect the Pump to 
an external pressure source. 

W

 Caution 

To prevent damage when a Pressure Module or Pressure 
Instrument is connected that could be damaged by 
pressures of 690 bar (10,000 psi), install and correctly 
set a relief valve in the system or an optional Fluke 
700PRV-1 Pressure Relief Valve on the Pump. 

1. 

Connect a 700 Series Pressure Module (the Pressure Module) 
to the Master Instrument Port (item 

.)  To connect to a 700P 

High Pressure Module (700P29, P30, or P31) install a male  
1/4-inch NPT Adapter. Use Teflon

®

 tape or equivalent on the 

NPT thread connections to prevent leaks. 

2. 

Fill and Prime the Pump. See “How to Prime the Test Pump”. 

3. 

Connect the Pressure Module to the calibrator as shown in 
Figure 1. 

4. 

Connect the input of the Pressure Unit Under Test (UUT) to the 
Test Pressure Port (item 

) on the Test Pump. 

5. 

Loosen the Pressure Bleed Knob (item 

) to release pressure 

from the Pump. 

6. 

Use the Calibrator to zero the Pressure Module. Refer to the 
Users Manual for instructions.  

7. 

Turn the Vernier Fine Adjustment Knob (item 

) to the  

middle-range. 

8. 

Turn the Pressure Bleed Knob (item 

) clockwise until it stops 

in the full closed position.  

9. 

Squeeze the handles together to pump fluid which will increase 
pressure. See the Notes in step 2 of the “How to Prime the Test 
Pump” procedure.  

W

 

Caution 

To prevent damage, do not let the pressure increase to 
more than the pressure rating of the equipment under 
test.  Pressure can increase quickly if the pressurized 
volume is small. 

10.  For incremental pressure adjustments, use the Vernier Fine 

Adjustment Knob. 

11.  Once the test is done, slowly turn the Pressure Bleed Knob 

(item 

) counter-clockwise to release pressure.  

1.888.475.5235

[email protected]

Fluke-Direct

.com

Отзывы: