SVCN 7 INSTALLATION, OPERATION, & MAINTENANCE
Total Minimum Flow
of Pumps in System
=
Minimum Flow
of Weakest Pump
+ (Total No. Pumps - 1) × (Strong Pump Flow)
1. Assume the minimum flow for a single pump is 27 GPM.
2. Data for the head - capacity curve:
At the rated point:
Strongest pump head =
(
)
3000
3000 2
100
3060
+
×
=
Weakest pump head =
(
)
3000
3000
2
100
2940
−
×
=
At Shutoff:
Strongest pump head =
(
)
3600
3600
2
100
3780
+
×
=
Weakest pump head =
(
)
3600
3600
2
100
3420
−
×
=
From head capacity curve:
Minimum weakest pump flow = 27 gpm
Minimum strongest pump flow = 65 gpm
Total minimum flow of pumps in a typical application with 2 pumps operating in parallel.
Total Minimum Flow of Pumps in System = 27 + (2-1) (65) = 92 GPM
4000
3780
3420
3000
20
27
40
60
80
100
CAPACITY GPM
STRONGEST PUMP
WEAKEST PUMP
Figure 3-3 Parallel Operation
3.3 LUBRICATION
A “Trico” brand oiler is normally furnished with the pump unless otherwise specified. If your pump
has oil mist type of lubrication, oiler and oiling rings are not provided. For bearings lubricated by
DO2604-13
- 3-4 -
Содержание SVCN 7
Страница 2: ...SVCN 7 PUMP INSTALLATION OPERATION MAINTENANCE 1 ...
Страница 15: ......
Страница 57: ......
Страница 60: ...SVCN 7 INSTALLATION OPERATION MAINTENANCE 5 3 DO2604 13 ...