Serck Audco TIPV Twin Isolation Plug Valve FCD - SRENIM0005-05 A4 – 02/17

3      

HEALTH AND SAFETY (cont.)

     

n) 

End Flanges: The end flange design of this product has been verified by either:

            

 

ASME Boiler and Pressure Vessel Code Section VIII Division 1 calculation method;

            

 

Finite Element Analysis in accordance with ASME Boiler and Pressure Vessel Code Section VIII  

 

       

 

Division 2 - Alternative rules;

            

 

Experimental testing as defined in BS EN 12516-3, Valve Design Strength - Part 3 Experimental  

 

     

 

Method.

       

 

Gaskets: The gaskets used in all methods are Spiral Wound to BS EN 1514-2 for PN rated Flanges    

       

 

and ASME B16.20 for Class rated flanges. These have Gasket Factors and Design Stresses of 2.5 and  

     

 

10000 psi respectively for Carbon Steel gaskets, and 3.0 and 10000 psi respectively for Stainless Steel  

       

 

gaskets, as defined in the ASME Boiler and Pressure Vessel Code Section VIII Division 1. 

       

 

If gaskets are used with higher Gasket Factors and Design Stresses than those stated above,  

 

       

 

please consult Serck Audco Valves Technical sales.  

       

 

Bolting: End flanges for steel valves have been verified by the methods stated above, using bolt  

 

       

 

design stress values based on those for ASTM A193 B7, B7M, B8, B8M as defined in ASME Boiler    

       

 

and Pressure Vessel Code Section II - Materials - Part D - Properties.

       

o) 

Lethal Service. In accordance with the design verification code (ASME Boiler and Pressure Vessel    

       

 

Code Section VIII Division 1) a casting quality factor of 1.0 is allowable for all products except those  

       

 

intended for ‘lethal service’. All products for such service must have had non-destructive examination  

       

 

carried out in accordance with Appendix 7 of the code. Refer to Serck Audco Valves Technical sales. 

       

p) 

If the processes or environments that the products are used in are likely to cause temperatures  

 

       

 

(high or low) that may cause injury to personnel if touched, then adequate insulation/protection must  

       

 

be fitted. It is recommended that the insulation allows easy access for maintenance, to the sealant    

       

 

and stem packing compound fittings, and to the valve operator.

       

q) 

If the equipment is to be used on unstable gas duty, ensure that the operational parameters as

       

 

indicated on the product identification plate cannot be exceeded.

       

r) 

This equipment should be protected by other devices to prevent over-pressurisation.

       

 

(i.e. caused by external fire, etc).

       

s) 

This equipment must be installed in a system that is designed to prevent excessive forces acting

       

 

on the flanges, connections, etc.

4      

PREPARATION FOR INSTALLATION

       

All protective packaging must be removed before installation.

 

       

It is recommended that additional sealant be injected prior to re-test and operation so as to ensure  

       

tight shut off, it is also recommended to re-energize the injectable stem packing compound.

 

       

Any excess sealant found around the plug port should be removed by using a scraper. 

 

       

Clean end connections to remove any unwanted paint or rust inhibitor.

 

       

Significant problems can arise with any valve installed in an unclean pipeline.

       

Ensure that the pipeline has been flushed free of dirt, weld spatter, etc. before installation.

       

The working area should be clean and clear of any debris which could contaminate the valve.

       

The valve should be fully opened or fully closed during cleaning operations.

       

Water and inert gases such as carbon dioxide and nitrogen are unlikely to affect the sealant.  

 

 

       

If solvents or steam cleaning are used, it is recommended that the valves are reinjected with sealant  

 

       

after completion of the cleaning operation. 

Содержание Serck Audco

Страница 1: ...Experience In Motion USER INSTRUCTIONS Installation Operation Maintenance Serck Audco TIPV Twin Isolation Plug Valve SRENIM0005 05 A4 02 17...

Страница 2: ......

Страница 3: ...ety 6 Preparation for Installation 7 Installation Instructions 8 Operation 9 Maintenance 10 Injection of Valve Sealant 10 Stem Packing compound adjustment 13 Adjustment of plug loading screw 14 Rotati...

Страница 4: ...ine painting The following areas should be masked with rubberised masking materials or caulk before shot blasting Top of stem and gland area Body Cover joint Stem packing compound injector Gear box fi...

Страница 5: ...in the limitations defined in tables 6 7 8 9 of Schedule 3 of the Pressure Equipment Regulations 2 2 ATEX Directive If the identity plate carries the Explosion Protection Symbol and codes identifying...

Страница 6: ...s such changes j The valve wrenches are only designed for use in operating the valves and must not be used to carry them by Failure to observe this warning may result in operator injury k Due to the l...

Страница 7: ...Refer to Serck Audco Valves Technical sales p If the processes or environments that the products are used in are likely to cause temperatures high or low that may cause injury to personnel if touched...

Страница 8: ...easy fitting of the gasket Care should be taken to prevent damage to the sealing surfaces Correct lifting equipment must be used when handling valves for operator safety see Section 3 paragraph k h A...

Страница 9: ...ing devices or be chained through the handwheel to prevent operation 6 2 WRENCH OPERATION Wrench operated valves have an arrow shaped position indicator fitted over the stem The arrow points in the di...

Страница 10: ...ittings unless the customer specifies special fittings such as sub sea To inject sealant a high pressure sealant gun with a Giant Buttonhead coupler is required The gun should also have a pressure gau...

Страница 11: ...ttonhead fitting on the valve Please refer to the manufacturers operating instructions for the operating and maintenance procedures of the sealant injection equipment Sealant can be injected with the...

Страница 12: ...injected with sealant the sealant pressure will quickly build up A valve that has not been well maintained could require a significant amount of sealant to be injected before pressure builds up and se...

Страница 13: ...operator indicator plate and the gear operator to valve body mounting area Portable electronic hydrocarbon detectors some are sensitive enough to detect stem leaks by placing the probe adjacent to th...

Страница 14: ...nt sealant onto the valve seats and is very easy to operate then the plug is probably not in close enough contact with the body seat and needs to be adjusted into the tapered body seat NOTE Damaged me...

Страница 15: ...es first and causes leakage There can be instances where the downstream plug seat is eroded while the upstream plug seat is still in good condition by rotating the plug through 180 degrees the good co...

Страница 16: ...etest the valve seats as appropriate 7 5 GEAR OPERATOR MAINTENANCE Gear operated TIPV valves are fitted with enclosed water tight worm gear operators Both single and double reduction units are used Ge...

Страница 17: ...ose A Improper setting of gear operator stops A Reset stops for proper operation 8 3 Leaks across seats A Lack of sealant B Incorrect sealant C Plug set incorrectly D Damaged seats A Inject sealant 7...

Страница 18: ...ctions in Section 7 and the Trouble Shooting Guide Section 8 you are unable to get the TIPV valve to operate and seal correctly then please contact Serck Audco Valves or our local representative for f...

Страница 19: ...Serck Audco TIPV Twin Isolation Plug Valve FCD SRENIM0005 05 A4 02 17...

Страница 20: ...nstructions included with the product and train its employees and contractors in the safe use of Flowserve products in connection with the specific application While the information and specifications...

Отзывы: