Electrolyte Level Sensor
Installation and Operation Instructions
when
adding to an existing watering system
Contents
(1) Eagle Eye Industrial Electrolyte Level Sensor (4) Zip Ties
(1) Instruction Sheet
(2) Screws
(1) No-ox Grease
(1) Swivel Tee
Tools Required
PPE
Screw Driver
1/4” Nut Drive
Specifications
Max Current Draw: 7mA
Nominal Operating Voltage: 12 - 48V
Operating Temperature: -22°F - 158°F
Replace with the sensor valve as shown. Use care
when helping the probe find its way into the cell.
3
Locate your battery posts (positive and negative).
We recommend that you place the probe as close to
the center of the pack as possible.
Probe cannot be
installed within three cells from a battery post (red
or black area as shown above).
Select a valve from a cell located near the center of
the battery, remove the swivel tee and valve.
2
Rotate clockwise to lock the valve in place and
reinstall swivel tee. (If this is a new install, connect
swivel tee to the valve and connect tubing.)
4
Secure the control box with a zip tie provided in a
secure location. Do not secure to watering system
tubing.
5
Take cover off of first inter-cell connector available
on each end for placing the red and black wires. We
recommend powering over the entire battery up to
48 volts.
6
1
Pos
Neg
BL-627 102519