Flotec FP5100 Скачать руководство пользователя страница 4

Installation

4

BEFORE YOU INSTALL YOUR PUMP

NOTICE:

Well must not be more than 20' (6.1m) depth

to water.

Step 1. Long runs and many fittings increase friction and

reduce flow. Locate pump as close to well as
possible; use as few elbows and fittings as possi-
ble. Be sure suction line is straight and angles
toward pump.

Step 2. Be sure well and pipe are clear of sand, dirt and

scale. Foreign matter will plug pump and void
warranty. Use new pipe for best results.

Step 3. Protect pump and all piping from freezing.

Freezing will split pipe, damage pump and void
warranty. Check locally for frost protection
requirements (usually pipe must be 12" (30.5cm)
below frost line and pump must be insulated).

Step 4. Be sure all pipes and foot valve are clean and in

good shape. 

Step 5. No air pockets in suction pipe.

Step 6. No leaks in suction pipe. Use Teflon tape or

Plasto-Joint Stik to seal pipe joints. 

Step 7. Unions installed near pump and well will aid in

servicing. Leave room to use wrenches.

Pump body may explode if used as booster

pump. DO NOT use in booster application.

Motor normally operates at high tempera-

ture and will be too hot to touch. It is protected from
heat damage during operation by an automatic internal
cutoff switch. Before handling pump or motor, stop
motor and allow it to cool for 20 minutes.

WELL PIPE INSTALLATION

NOTICE:

Use installation method below which matches

your well type.

CASED WELL/DUG WELL INSTALLATION

Step 1. Inspect foot valve to be sure it works freely.

Inspect strainer to be sure it is clean and secure.

Step 2. Connect foot valve and strainer to first length of

suction pipe and lower pipe into well. Add sec-
tions of pipe as needed, using Teflon tape on
male threads (use 1-1/2" pipe for suction pipe).
Be sure all suction pipe is leakproof or pump will
lose prime and fail to pump. Install foot valve 10
to 20 ft. (3 to 6 m) below lowest level to which
water will drop while pump is operating (pump-
ing water level). Your well driller can furnish this
information.

Step 3. To prevent sand and sediment from entering

pumping system, foot valve/strainer should be at
least 5 ft. (1.5 m) above bottom of well.

Step 4. When proper depth is reached, install sanitary

well seal over pipe and in well casing. Tighten
bolts to seal casing.

Step 5. When using foot valve, a priming tee and plug

are recommended. (Fig. 1).

Suction

pipe

Foot

Valve

Priming plug

Priming tee

Standing water

level (pump off)

Drawdown water

level (pump on)

10-20' (3-6 m)

20' (6 m) max.

At least 5 feet (1.5 m)

828 0993

For parts or assistance, call Flotec Customer Service at 

1-800-365-6832

Figure 1: Cased/Dug Well Installation

Содержание FP5100

Страница 1: ...365 6832 English Pages 2 11 Installation Fonctionnement Pi ces Pour plus de renseignements concernant l utilisation l installation ou l entretien Composer le 1 800 365 6832 Fran ais Pages 12 21 Instal...

Страница 2: ...perate at high temperatures To avoid burns when servicing pump allow it to cool for 20 minutes after shut down before handling Pump is designed as a lawn sprinkler only To avoid heat built up over pre...

Страница 3: ...or purchasing a top quality factory tested pump Page General Safety 2 Installation 4 5 Electrical 6 7 Operation 8 Troubleshooting 9 Repair Parts 10 Warranty 11 For parts or assistance call Flotec Cust...

Страница 4: ...atic internal cutoff switch Before handling pump or motor stop motor and allow it to cool for 20 minutes WELL PIPE INSTALLATION NOTICE Use installation method below which matches your well type CASED...

Страница 5: ...ipe Do not use hose or plastic tubing See Well Pipe Installation for more information NOTICE Use only Teflon tape or Teflon based joint compounds for making all threaded connections to the pump itself...

Страница 6: ...cover 2 metal tabs The arrow on the plug will point to 115V 4 Attach the power lead wires to the power lead termi nals Make sure the wires are secure 5 Attach the ground wire to the green ground screw...

Страница 7: ...10 feet long Do not connect to plastic pipe or insulated fittings Step 6 Protect current carrying and grounding conduc tors from cuts grease heat oil and chemicals Step 7 Connect current carrying cond...

Страница 8: ...water not more than 20 6 m and length of horizon tal run 10 3 m of horizontal suction pipe 1 30 5 cm of vertical lift due to friction losses in pipe If no water is produced within 10 minutes stop pum...

Страница 9: ...lost prime through In installation already in use 1 Air leaks 1 Check all connections on suction line and shaft seal with soapy water 2 Water level below suction pipe inlet 2 Lower suction line into...

Страница 10: ...late Complete L176 47P1 L176 47P1 C103 189P 11 V Clamp C19 54SS C19 54SS C19 37A 12 Pump Body Front Half C176 53P C176 53P C176 62P 14 Base C4 42P C4 42P C4 42P Seal and Gasket Kit FPP5000 FPP5000 FPP...

Страница 11: ...n nor due to improper installation operation mainte nance or storage nor to other than normal application use or service including but not limited to operational failures caused by corrosion rust or o...

Страница 12: ...la pompe la laisser refroidir pen dant 20 minutes apr s l avoir arr t e avant de la toucher La pompe est con ue uniquement en tant que syst me d arrosage gazon Pour viter toute accumulation de chaleur...

Страница 13: ...lient le Flotec en composant le 1 800 365 6832 Table des mati res 13 Merci d avoir achet une pompe de qualit sup rieure mise l essai l usine Page S curit 12 Installation 14 15 lectricit 16 17 Fonction...

Страница 14: ...enchement automatique Avant de manipuler la pompe ou le moteur arr ter le moteur et le laisser refroidir pendant 20 minutes INSTALLATION DE LA TUYAUTERIE DU PUITS REMARQUE Appliquer la m thode d insta...

Страница 15: ...installation et le bon fonction nement appeler le service la client le Utiliser un tuyau rigide Ne pas utiliser de tuyaux flexibles ou en plastique Voir Installation de la tuyauterie du puits pour pl...

Страница 16: ...es fils d alimentation sur les bornes S assurer que les fils sont bien retenus en place 5 Brancher le fil de mise la terre sur la vis verte de mise la terre 6 Reposer le couvercle du moteur Passer la...

Страница 17: ...sur le tubage d un puits ayant au moins 10 pieds de long Ne pas brancher sur un tuyau en plastique ou sur des raccords isol s 6 Prot ger les conducteurs transporteurs de courant mis la terre contre le...

Страница 18: ...m 20 pi et de la longueur de canalisation horizontale 3 m 10 pi de tuyau d aspiration horizontal 30 5 cm 1 pi d l vation verticale provoqu e par les pertes de friction dans le tuyau Si la pompe n extr...

Страница 19: ...pompe pompe Si la baisse de niveau de l eau dans le puits est sup rieure la force d l vation de l aspiration il faut utiliser une pompe de puisage en eau profonde La roue motrice est bloqu e Nettoyer...

Страница 20: ...KG 4 Plaque d tanch it L176 47P1 L176 47P1 C103 189P 11 Collier C19 54SS C19 54SS C19 37A 12 Molti avant du corps de la pompe C176 53P C176 53P C176 62P 14 Socle C4 42P C4 42P C4 42P N cessaire de bag...

Страница 21: ...s correctement ni ceux qui n ont pas t utilis s ou entretenus normalement y compris mais sans s y limiter aux produits ayant des pan nes de fonctionnement caus es par la corrosion la rouille ou autre...

Страница 22: ...pu s de apagarla Esta bomba se ha dise ado para ser usada nicamente en rociadores de c sped Para evitar peligros de recalen tamiento o sobrepresi n y posibles lesiones no la use en un sistema de agua...

Страница 23: ...ente al 1 800 365 6832 Indice de Contenido 23 Gracias por adquirir una bomba de calidad superior que ya ha sido probada en la f brica Page Seguridad General 22 Instalaci n 24 25 Electricidad 26 27 Ope...

Страница 24: ...damente 20 minutos INSTALACI N DEL TUBO EN EL POZO AVISO Use el m todo de instalaci n descrito a continuaci n que mejor se adapte al tipo de pozo que usted tiene INSTALACI N EN POZO REVESTIDO O EN POZ...

Страница 25: ...e Use tuber a rigida No utilice mangueras o tubos de pl stico Para mayor informaci n cons ltese la secci n Instalaci n de la tuber a en el pozo AVISO Utilice solamente cinta de tefl n o compuestos par...

Страница 26: ...cte el cable de puesta a tierra al tornillo verde de pues ta tierra 6 Vuelva a colocar la cubierta del motor Pase a la secci n de Conexiones de Cableado a continuaci n SELECTOR DE TENSI N TIPO CUADRAN...

Страница 27: ...nea o una envoltura para pozos de por lo menos 10 pies de largo No conecte a un tubo de pl stico o a accesorios aislados Paso 6 Proteja los conductores de puesta a tierra y los que lle van la corrient...

Страница 28: ...a bomba del agua que no debe ser mayor de 20 pies 6 m y de la longitud del tramo horizontal 10 pies o 3 m de tubo horizontal de suc ci n que equivalen a 1 pie 30 5 cm de ascenso verti cal debido a las...

Страница 29: ...tuber a usando el tama o de los orificios de aspiraci n y descarga en la bomba La bomba ha perdido el cebado debido a En instalaciones ya en uso 1 Fugas de aire 1 Verifique las conexiones en la l nea...

Страница 30: ...J218 883APKG 4 Placa Obturadora Completa L176 47P1 L176 47P1 C103 189P 11 Abrazadera C19 54SS C19 54SS C19 37A 12 Mitad Delantera del Cuerpo de la Bomba C176 53P C176 53P C176 62P 14 Base C4 42P C4 42...

Страница 31: ...eraciones ni debido a instalaci n funcionamiento mantenimiento o almacenaje incorrectos ni a ningu na otra cosa que no sea su aplicaci n uso o servicio normales incluyendo pero no limitado a fallas op...

Страница 32: ......

Отзывы: