background image

-

6

-

QS200 WIRING INSTALLATION (Tee and Meter should be installed before splice connections)

Make sure wiring is only done on low DC voltage (7.5 V

DC

 to 36 V

DC

). Make sure to follow all of the Controller/Decoder 

manufacturer’s directions for electrical safety. Also, refer to the 

General Safety Instruction

 section provided in this 

document. 

NOTE:

 Please read this entire section before any physical wiring installation is started.

During this procedure DO NOT pull on the QS200 wires 

under any circumstances.

1.  Locate wires on QS200. Red wire (+) and Black 

wire (-) are the only two wires on QS200.

2.  1 Pair - #18 AWG wire cable (Direct Burial) 

cable is recommended. Controller manufacturer 

may recommend thicker gauge wire for longer 

distance (which is fine since the recommended 

splice kit accepts thicker gauge wire sizes).  

3.  Document the specific cable wire colors that are 

being spliced to the QS200 Red (+) and Black (-) 

wires. This will help when connecting the other 

end of the cable to the controller (as described in 

Step 7 of this section).

4.  3M DBR/Y-6 splice kit (or equivalent) is 

recommended to splice connect the QS200 

to the cable. Follow instructions (See Below 

3M DBR/Y-6 Splice Instructions for QS200) on 

splice kit to ensure a good, solid, and waterproof 

connection is obtained.

5.  Ensure that a service loop is provided at the flow 

meter in case future maintenance is needed.

6.  Make sure not to puncture or splice the cable 

that goes from the meter to the controller/

decoder (to prevent ground interference). Make 

sure cable length is within controller/decoder 

manufacturer’s recommendation.

7.  Connect the (+) and (-) ends (as described in 

Step 3 of this section) of the direct burial cable 

to the controller’s/decoder’s flow sensor input 

(or port) per controller/decoder manufacturer’s 

direction. Keep in mind that the flow sensor input 

(typical designation for irrigation controller’s 

flow meter/flow sensor input) or the port (typical 

designation for decoder’s flow meter/flow sensor 

input) must be an input that can accept a flow 

sensor and provides power to the QS200 

 

(7.5 V

DC

 to 36 V

DC

).

3M DBR/Y-6 Splice Instructions for QS200

NOTE:

 Wiring diagram is shown in Figure 13. 

1.  When using cable, cut off the unused wires so 

that they are even with the sheath of the cable. 

NOTE:

 Remember the color of the twisted pair of wires you 

use so that you can make an identical connection with the 

same wires later. 

2.  3M DBR/Y-6 Splice Kit Instructions:

a.  Strip insulation ¾ in. (19 mm 

(see Fig. 12a). 

b.  With wire ends even, insert wires 

into the connector and tighten 

until secure (see Fig. 12b). 

c.  Insert the connector all the way into the tube 

until the connector rests on the bottom of the 

tube (see Fig. 12c). 

NOTE:

 If having difficulty getting the twist-on connector 

down into the tube when using small gauge wires, use a 

thin, non-conductive object to push the connector to the 

bottom of the tube. Upon removal of the object, ensure that 

no voids or water paths remain in the grease. 

d.  Fold the wires into the channels.

e. 

Close the cap (see Fig. 12d).

Figure 12a

Figure 12b

Figure 12c

Figure 12d

Содержание QS200

Страница 1: ...f the meter 5 times the pipe s inner diameter downstream of the meter The pipe needs to be full of irrigation water with no air inside Built up sediment on the QS200 s transducers or large debris can greatly hinder the meter s performance Keep the following in mind when installing Install QS200 at an angle as shown in Figure 1a 1 inch pipe installations will need a larger angle of 45 degrees Flow ...

Страница 2: ...sert in the Tee but it is recommended to install the Tee first without the QS200 insert inside This will keep excess PVC cement off of the QS200 insert 2 Clean and apply Primer to pipe ends and tee sockets See Figure 3 3 Apply PVC cement to pipe ends and Tee sockets and quickly assemble the parts while the cement is fluid Follow the cement manufacturer s instructions See Figure 4 NOTE Only use PVC...

Страница 3: ...etrofits 1 The Tee insert bore must be clean before installing the insert and the 2 black O rings on the insert should be fully lubricated a The O rings on the outside of the QS200 Retrofit Insert are square profile O rings When installing in another brand of Tee if the insert fits too tight into the Tee replace the square profile O rings with the round profile O rings included with the QS200 Retr...

Страница 4: ... or driving wedge between the insert lip and top of the tee to break the insert loose and gain room between the insert lip and tee to use the U formed end to lever the insert up and out 2 An alignment tool to align the pin holes of the new insert with the pin holes in the tee 3 A cleaning tool for clearing debris from the valve box lid groove or other crevices The U formed end is designed for use ...

Страница 5: ...all New QS200 Insert FLOMEC Multi Tool PIN HOLE ALIGNMENT For easy pin install CLEAN LID GROOVE Remove dirt roots debris Figure 10 Remove Old Insert From Tee with FLOMEC Multi Tool PRY UP To break a stuck insert loose LEVERAGE To Lift insert up and out DRIVING WEDGE To lift insert more ...

Страница 6: ... from the meter to the controller decoder to prevent ground interference Make sure cable length is within controller decoder manufacturer s recommendation 7 Connect the and ends as described in Step 3 of this section of the direct burial cable to the controller s decoder s flow sensor input or port per controller decoder manufacturer s direction Keep in mind that the flow sensor input typical desi...

Страница 7: ...to devices as flow sensor instead of flowmeter 1 Make sure line is full of water with no trapped air 2 Flow meter may take a few minutes to start averaging out flow per irrigation controller displays 3 It is recommended to monitor and observe stabilized flow rates before setting control limits Operation QS200 WIRING INSTALLATION continued RED BLACK DBR Y 6 SPLICE KIT FLOW INSERT TO FLOW ON FLOW SM...

Страница 8: ...o putting into service Product should never be operated outside its published specifications for temperature or pressure See specifications for your model When applying power adhere to specifications listed in appropriate electronics manual Make sure flow and pressure have been eliminated from process pipe prior to installing or removing product This product is not approved for use with petroleum ...

Отзывы: