![Flomec 125100-10 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/flomec/125100-10/125100-10_owners-manual_2306711008.webp)
8
INSTALLATION
Installing Module
NOTE:
Factory installed 4-20mA modules will have the zero set to the meter’s minimum
specified flow rate and the span will be set to the meter’s maximum specified flow rate.
1.
Remove the display electronics from the front of the turbine.
NOTE:
If you are installing more than one module at a time, take care to keep the proper
electronics paired with the original turbine.
NOTE: If your display currently has batteries installed, you will need to remove them
to enable the 4-20mA and scaled pulse output to function.
2.
Disconnect 2-pin coil connector from display. Make sure coil remains firmly attached to
meter body (DO NOT pull on wires or attempt to remove from meter body).
3.
Connect the 4-20mA Module to the 10-pin connector located on the backside of the
computer electronics (see Figure 2).
4.
Reconnect the coil connector to the 2-pin terminal block on the other end of the computer
backside. Once the cables are installed on the display, the housing of the display can be
placed on top of the 4-20mA module (see Figure 2).
5.
Install the computer electronics to the front side of the turbine. Tighten the four screws
snugly.
Module shown installed on G2 1” stainless steel flowmeter
Figure 2