STEP 1
Remove shipping plugs from Quad pump ports. Some
water from factory testing may spill out.
STEP 2
Install inlet A and discharge B port connectors. Slide
clips toward rear, install ports and firmly push slide clips
C forward to lock port connectors in place.
STEP 3
Slide rubber mounts fully into 4 mounting tracks.
STEP 4
Mount pump vertically, with pump head down or
horizontally in an accessible location (pump is not
submersible). If mounting vertically, motor up, attach
motor mounts first, then pump head mounts, while
supporting weight of pump.
STEP 5
Use 3/4”’ I.D. flexible hose (preferably braided or
reinforced). Use hose clamps on the slip-on barb hose
connections. Use of reinforced vinyl hose is recom-
mended.
STEP 6
Install a Flojet #01610-000 strainer in an accessible
location (for inspection and cleaning) between the bilge
pick up and pump inlet. This strainer or equivalent is
required
for pump warranty to be valid.
STEP 7
Installation of a screen on the bilge pick up will require
less strainer cleaning.
INSTALLATION
STEP I
Use 14 gauge stranded wire to 20’, 12 gauge to 50’,
from power source.
STEP 2
Use a 15 amp rated on-off switch on the (+) positive (red)
motor lead.
STEP 3
Install 15 amp fuse protection on the switched (+)
positive lead for 12 volt -114 model; use 10 amp fuse on
24 volt -314 model; and 5 amp fuse on 32 volt -414
model.
WIRING
Fuse
(+)
Switch
Battery
(–)
Black (–)
Flojet
Bilge Pump
Flojet Inlet
Strainer
B
A
C