IMPORTANT:
BE SURE THAT THE DRAINAGE
HOLES IN THE FRAME BEAMS ARE
ON THE BOTTOM AT TIME OF
INSTALLATION
STEP 1
•
LINE UP THE NUT AND WASHER WITH THE HOLE IN THE CORNER POST AND FASTEN WITH THE 3/8” X 3/4”
BOLT THAT WAS REMOVED FROM EACH OF THE LEVELING LEGS (FIGURE 1.4).
•
LEAVE LEVELING LEG EXTENDED OUT 8” AND TORQUE TO 40 FT-LB (FIGURE 1.5).
FIGURE 1.4
FIGURE 1.5
4X
4X