FLIR VS80C10-25RM Скачать руководство пользователя страница 6

Centring Head Installation

Centring Head with Side View Mirror Installation

Distance Gauge

The backlit electronic gauge (3) measures and displays the dis-
tance the probe travels into the inspection area in meters and feet.
The gauge tracks forward and reverse movement.

Powering the Distance Gauge

The distance gauge is switched ON or OFF by pressing the power
button (7) for three seconds. After one hour, the gauge will auto-
matically switch off, to conserve battery energy.

The battery status icon (12) shows the current battery power. To re-
place the batteries, follow the steps below:

1. Switch the meter off by pressing the power button (7) for three

seconds.

2. Loosen and remove the battery compartment screw (9).
3. Remove the compartment cover (8).
4. Remove the old batteries and dispose of them responsibly.
5. Install the two new AAA batteries, observing correct polarity.
6. Close the compartment and secure it with the compartment

screw.

Change the Measurement Units

The display shows the probe travel distance in meters (m) and feet
(ft), short press the units button (11) to toggle the displayed units.

#NAS100103; r. AB/83715/84877; en-US

5

Содержание VS80C10-25RM

Страница 1: ...User Manual Pipe Inspection Camera Probe Model VS80C10 25RM...

Страница 2: ...High Performance Vid eoscope See the VS80 manual for complete instructions on image and video management Wi Fi connectivity split screen modes and other features Obtain the VS80 user manual and addit...

Страница 3: ...klight button 11 Unit of measure button 12 Battery status 13 Unit of distance measure meters 14 Unit of distance measure feet Safety Safety Note Please read and understand all safety cautions before u...

Страница 4: ...electronics of the camera Do not strike the probe or allow it to impact objects forcefully The following liquids have been approved for sub mersion of the camera probe Brake and transmis sion fluid di...

Страница 5: ...variety of pipe sizes Side View 70 Mirror Accessory 1 70 mirror 2 Align the probe worklight with the opening on the accessory 3 Threaded probe connection Note that the mirror s protective film must b...

Страница 6: ...ery energy The battery status icon 12 shows the current battery power To re place the batteries follow the steps below 1 Switch the meter off by pressing the power button 7 for three seconds 2 Loosen...

Страница 7: ...g the camera After connecting the probe to the VS80 verify that a clear cam era image is displayed If not or if the image is flickering or other wise compromised remove the probe and reattach it Conta...

Страница 8: ...0 to 60 Storage temperature 14 to 140 10 to 60 Water proof ingress rating Probe tip and body IP 67 IEC 60529 Protected from submersion in water up to 3 3 ft 1 m for 30 minutes maximum In use rain spla...

Страница 9: ...nty and Support Three Year Limited Warranty This product is protected by FLIR s 3 Year Limited Warranty Visit www flir com testwarranty to read the 3 Year Limited Warranty document CUSTOMER SUPPORT Cu...

Страница 10: ...NAS100103 r AB 83715 84877 en US 9...

Страница 11: ......

Страница 12: ...rt flir com Copyright 2022 FLIR Systems Inc All rights reserved worldwide Disclaimer Specifications subject to change without further notice Models and accessories subject to regional market considera...

Отзывы: