![FLIR VS80C10-25RM Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/flir/vs80c10-25rm/vs80c10-25rm_user-manual_2306057006.webp)
Centring Head Installation
Centring Head with Side View Mirror Installation
Distance Gauge
The backlit electronic gauge (3) measures and displays the dis-
tance the probe travels into the inspection area in meters and feet.
The gauge tracks forward and reverse movement.
Powering the Distance Gauge
The distance gauge is switched ON or OFF by pressing the power
button (7) for three seconds. After one hour, the gauge will auto-
matically switch off, to conserve battery energy.
The battery status icon (12) shows the current battery power. To re-
place the batteries, follow the steps below:
1. Switch the meter off by pressing the power button (7) for three
seconds.
2. Loosen and remove the battery compartment screw (9).
3. Remove the compartment cover (8).
4. Remove the old batteries and dispose of them responsibly.
5. Install the two new AAA batteries, observing correct polarity.
6. Close the compartment and secure it with the compartment
screw.
Change the Measurement Units
The display shows the probe travel distance in meters (m) and feet
(ft), short press the units button (11) to toggle the displayed units.
#NAS100103; r. AB/83715/84877; en-US
5
Содержание VS80C10-25RM
Страница 1: ...User Manual Pipe Inspection Camera Probe Model VS80C10 25RM...
Страница 10: ...NAS100103 r AB 83715 84877 en US 9...
Страница 11: ......