background image

CCWR

Follow this guide to ensure the system is 
properly installed and performing as intended.
Use the indicator lights to check performance, 
making adjustments as needed. 

Contact support hotline for advice.

Note        

Mount the base unit in or near 
the control box.

Secure the antenna as high as 

possible by utilizing the 

extension cable.

Orientate the antenna’s horizontal 
edge to face the load cell. 
Maintain line-of-sight, if possible. 

Note

 Mount the load cell, top plate and 
washer set as recommended.

Position the front of the load cell 
(Flintec logo) toward the base 

unit.

Connect battery and seal the 
door. 

Use the indicator lights to verify 
the system is working properly 

INSTALLATION SUPPORT HOTLINE: (978) 333-7539

1

3

5

6

4

2

Mount the base 

unit and antenna

Position the 
antenna

Mount the 

load cell and 
rotate toward 

base unit

Connect 
the wires

Install the 
battery

red

green

white

black

yellow

grey

violet

Vref+

Sig+

Sig-

Vref-

Shield

P

Position-

black

yellow

red

Ground

Shield

12 - 24VDC

Installation 

Guide

Good signal (Off)
Poor signal (Yellow)
No signal (Red)

Data is being 
transferred 
(Blue / 
red flashes)

Link quality
indicator

Comms indicator

Base unit has power 
(Red)

Power indicator

power

signal

flintec.com

0102384 v1.0

Отзывы: