
17
Plan the installation
Planning is the key of a successful installation of a central vacuum system. A
balance between the best locations for the inlet valves and the practicality of
ENG
installing in these locations is essential. With a little ingenuity, most locations can
be reached.
Hose lengths
Let customers know that you will custom the hose size to fit each floor. Hose kits
come in 9 m, 12 m or 15 m lengths.
Power Unit Selection
It is important to keep in mind that air flow is reduced with longer hoses. To com-
pensate for the loss of air flow, a larger power unit is required.
Valve locations
A
50’
(15.2 m) hose will usually cover between 170-220 m
2
.
Plan pipe runs
Carefully read the
“pipe
runs”
section of this guide. There is also a diagram of four
typical pipe runs.
Rough In
(measurements in mm)
182
143
Max
48
25
9.5
Min
50
261
Содержание 230152
Страница 4: ...4 98 14...
Страница 7: ......
Страница 12: ...10 tubo...
Страница 20: ...18 98 14...
Страница 23: ......
Страница 28: ...24...
Страница 36: ...32 98 14...
Страница 39: ......
Страница 44: ...38 flexible...
Страница 46: ...40 Installation sur deux tages vers le haut...
Страница 55: ......
Страница 60: ...52 aufbewahrt...
Страница 62: ...54 Ausrichtung nach oben ber zwei Etagen...
Страница 69: ...61 98 14...
Страница 76: ...66 manguera...
Страница 78: ...68 Instalaci n en dos plantas hacia arriba...
Страница 84: ......
Страница 85: ...73 NOTE...
Страница 86: ...74...