8 |
EN:
It is possible to connect up to 31modules DRV and control them with
one T-box controller .|
EN:
DRV modules can be connected to the BMS (Building Management
System).
5. START-UP AND OPERATION
Start-up
•
supply and controls have to be connected as shown in technical manual
•
before connecting supply check that current is same as on the nameplate
•
start-up without grounding cable is forbidden
Operation
•
unit designed to indoor operation
•
never place any things on the casing while operating
•
unit should be serviced periodically; in case of failure the unit should be
switched off immediately
Never operate a failure unit. The producer does not take any
responsibility for damages caused by failure operation.
Switch off the electrical supply while servicing or cleaning.
Periodic inspections
To keep proper technical parameters Flowair recommends periodic
service (every 6 months) of fan heaters on behalf of the user.
During inspections user should:
Check heating elments , if is it filled with dirt or dust. If necessary - use
industrial vacuum cleaner or pressurized air stream to clean the
exchanger’s lamellas.
Excessive dirt on the heaters can cause
permanent loss of the rated parameters,
Check fan blades, in case of dirt use damp cloth and remove dirt,
Check bracket installation,
Check wires insulation,
Check power supply,
Check levelling of the unit.
Содержание LEO EL L BMS
Страница 1: ...LEO EL S L BMS ...
Страница 9: ... 9 ...
Страница 11: ... 11 ...
Страница 13: ... 13 ...
Страница 16: ...16 www flowair com 52383 MT DTR LEO EL S L EN PL NL RU V1 ...