Bulk Bag Discharge Frame Installation and Operation Manual 

 

            - 12 - 

FLEXICON CORPORATION  

2400 Emrick Boulevard   Bethlehem, PA 18020-8006  USA 

Tel: 1-888-FLEXICON   Tel: 1-610-814-2400   Fax: 1-610-814-0600   www.flexicon.com

 

  8.8  Mount each air cylinder between the tab on the bottom of the Flow Flexer

®

 Bulk Bag 

Agitation Device plate to the tab on the inside of cross brace "C" using the (4) clevis and 

cotter pins (see figure 11).  Make sure that the tubing fittings on both air cylinders are 

oriented toward the front of the frame as shown. 

 

  8.9  Assemble (4) "P" clips to the bottom of each safety frame cross brace using (8) ¼“dia x ¾" 

long drive rivet anchors and (8) ¼" flat washers.  The ¼" steel flat washer is placed onto 

and against the head of the rivet anchor which is then placed thru the holes in the “P" clip.  

The portion of the rivet anchor protruding thru the "P" clip is then placed into the hole in the 

safety frame.  While firmly pressing the components against the frame, drive the steel core 

pin of the rivet anchor into the rivet until the head of the pin is flush to the head of the rivet 

(see figure 12). 

 

  8.10  Mount the Flow Flexer

®

 Bulk Bag Agitation Device control panel to the frame.  The panel is 

bolted to the frame in four locations with (4) 5/16-18 x 1" long hex head bolts, (4) 5/16 split 

lock washers and (4) 5/16 flat washers at two places on the bottom of cross brace "B" and 

two on the inside face of cross brace "C" (see figure 13).  The method of installing the panel 

using drive rivet anchors and ¼" flat washers is identical to that described in step 8.9. 

 

  8.11  Assemble (2) "P" clips, (1) in the center of the underside of each cross brace "B" using rivet 

anchors as described in step 8.9. 

 

  8.12  Connect four lengths (cut to length by customer) of the 3/8" O.D. ¼" I.D. plastic tubing 

between the male run tees on the solenoid manifold to the fittings on the air cylinders.  Run 

the tubing to the right air cylinder thru the (6) “P" clips, (2) on underside of the rear safety 

frame cross brace, as shown in figures 12, 13 and 14. 

 

  8.13 Installation of the Flow Flexer

®

 Bulk Bag Agitation Device Plexiglas Shields. 

 

8.14 To ensure the delivery of a quality product, FLEXICON® ships the (2) Plexiglas shields      

         loose to decrease the possibility of damage during shipment.  This includes leaving the 

protective peel-off covering on the shields which must be removed before installation to the 

frame. 

 

8.15  The shields span the area between both pairs of cross braces "B" and "C" on the outside   

of the frame.  In figure 5, the (8) small holes, (4) on cross brace "B” and (4) on cross brace 

"C” are visible on the right side of the frame. 

 

  8.16  Position the shield to clear the four existing bolts and washers securing the safety frames    

Via the (4) large holes in the shield while aligning the remaining holes in cross braces "B"      

and "C".  Secure with (8) ¼" rivet anchors, (8) ¼" flat washers per shield.  DO NOT USE    

EXCESSIVE FORCE to install rivet anchors as this may cause damage to the shield. 

   

 

 

 

 

Содержание BFC

Страница 1: ...400 Emrick Boulevard Bethlehem PA 18020 8006 USA Tel 1 888 FLEXICON Tel 1 610 814 2400 Fax 1 610 814 0600 www flexicon com FLEXICON Bag Discharge Frame Models BFF BFC Installation and Operation Manual...

Страница 2: ...ve common sense approach to unloading even the most difficult materials from bulk bags makes installation and operations of your FLEXICON bulk bag discharging system quick and simple Please refer to t...

Страница 3: ...TABLE OF CONTENTS 1 Introduction 2 Precautions 3 Bulk bag discharge frame installation procedure 4 BFC upper frame installation 5 Loading a bulk bag on the frame 6 Interfacing the bulk bag downspout w...

Страница 4: ...not use the bulk bag discharge frame for materials other than what it was specified for If you add new materials please consult with FLEXICON CORPORATION before doing so Do not allow agglomerating or...

Страница 5: ...1 Bag lift frame 1 Hardware kit Not on all models 3 1 3 If your base frame has been supplied as a kit assemble the base frame following steps 3 2 thru 3 13 Otherwise begin installation at step 3 14 3...

Страница 6: ...see figure 3 The right leg is the exact opposite of the left 3 7 With assembly still lying flat on the work surface assemble the remaining cross brace A to the opposing pair of studs located on the i...

Страница 7: ...18 otherwise proceed with step 3 17 3 17 Install the 4 extension arms to the base frame Orient each arm as shown in figure 7 Slide into the top of each respective leg to the lowest height setting and...

Страница 8: ...braces will be self evident Attach using 6 13 x 1 long bolts 12 flat washers 6 split lock washer and 6 13 hex nuts 4 9 Assemble the 2 G cross braces which connect between the inside rear bolt on each...

Страница 9: ...tance over the top of the bulk bag 5 1 3 Pass the loops of the bulk bag over and onto the self retaining bag loop retainers 5 1 4 Raise the bag lift frame and bulk bag with a forklift truck and positi...

Страница 10: ...tion and operation manual furnished with the specific equipment being installed The typical outlet spout of a bulk bag has a protective cover which is released by loosening a drawstring The outlet spo...

Страница 11: ...nted as shown Using 4 13 x 3 long bolts 8 flat washers 4 split lock washers and 4 13 hex nuts 8 4 Using figure 11 as a reference slide a split collar onto each end of the rod on each side of the Flow...

Страница 12: ...race B and two on the inside face of cross brace C see figure 13 The method of installing the panel using drive rivet anchors and flat washers is identical to that described in step 8 9 8 11 Assemble...

Страница 13: ...the bag The air cylinders to move the Flow Flexer Bulk Bag Agitation Device plates are located in the center of and directly beneath the plates There are adjustments for the pressure in both directio...

Страница 14: ...Bulk Bag Discharge Frame Installation and Operation Manual 14 FLEXICON CORPORATION 2400 Emrick Boulevard Bethlehem PA 18020 8006 USA Tel 1 888 FLEXICON Tel 1 610 814 2400 Fax 1 610 814 0600 www flexi...

Страница 15: ...Bulk Bag Discharge Frame Installation and Operation Manual 15 FLEXICON CORPORATION 2400 Emrick Boulevard Bethlehem PA 18020 8006 USA Tel 1 888 FLEXICON Tel 1 610 814 2400 Fax 1 610 814 0600 www flexi...

Страница 16: ...Bulk Bag Discharge Frame Installation and Operation Manual 16 FLEXICON CORPORATION 2400 Emrick Boulevard Bethlehem PA 18020 8006 USA Tel 1 888 FLEXICON Tel 1 610 814 2400 Fax 1 610 814 0600 www flexi...

Страница 17: ...Bulk Bag Discharge Frame Installation and Operation Manual 17 FLEXICON CORPORATION 2400 Emrick Boulevard Bethlehem PA 18020 8006 USA Tel 1 888 FLEXICON Tel 1 610 814 2400 Fax 1 610 814 0600 www flexi...

Страница 18: ...Bulk Bag Discharge Frame Installation and Operation Manual 18 FLEXICON CORPORATION 2400 Emrick Boulevard Bethlehem PA 18020 8006 USA Tel 1 888 FLEXICON Tel 1 610 814 2400 Fax 1 610 814 0600 www flexi...

Страница 19: ...Bulk Bag Discharge Frame Installation and Operation Manual 19 FLEXICON CORPORATION 2400 Emrick Boulevard Bethlehem PA 18020 8006 USA Tel 1 888 FLEXICON Tel 1 610 814 2400 Fax 1 610 814 0600 www flexi...

Страница 20: ...Bulk Bag Discharge Frame Installation and Operation Manual 20 FLEXICON CORPORATION 2400 Emrick Boulevard Bethlehem PA 18020 8006 USA Tel 1 888 FLEXICON Tel 1 610 814 2400 Fax 1 610 814 0600 www flexi...

Страница 21: ...Bulk Bag Discharge Frame Installation and Operation Manual 21 FLEXICON CORPORATION 2400 Emrick Boulevard Bethlehem PA 18020 8006 USA Tel 1 888 FLEXICON Tel 1 610 814 2400 Fax 1 610 814 0600 www flexi...

Страница 22: ...Bulk Bag Discharge Frame Installation and Operation Manual 22 FLEXICON CORPORATION 2400 Emrick Boulevard Bethlehem PA 18020 8006 USA Tel 1 888 FLEXICON Tel 1 610 814 2400 Fax 1 610 814 0600 www flexi...

Страница 23: ...Bulk Bag Discharge Frame Installation and Operation Manual 23 FLEXICON CORPORATION 2400 Emrick Boulevard Bethlehem PA 18020 8006 USA Tel 1 888 FLEXICON Tel 1 610 814 2400 Fax 1 610 814 0600 www flexi...

Страница 24: ...Bulk Bag Discharge Frame Installation and Operation Manual 24 FLEXICON CORPORATION 2400 Emrick Boulevard Bethlehem PA 18020 8006 USA Tel 1 888 FLEXICON Tel 1 610 814 2400 Fax 1 610 814 0600 www flexi...

Страница 25: ...Bulk Bag Discharge Frame Installation and Operation Manual 25 FLEXICON CORPORATION 2400 Emrick Boulevard Bethlehem PA 18020 8006 USA Tel 1 888 FLEXICON Tel 1 610 814 2400 Fax 1 610 814 0600 www flexi...

Страница 26: ...Bulk Bag Discharge Frame Installation and Operation Manual 26 FLEXICON CORPORATION 2400 Emrick Boulevard Bethlehem PA 18020 8006 USA Tel 1 888 FLEXICON Tel 1 610 814 2400 Fax 1 610 814 0600 www flexi...

Страница 27: ...Flexicon for special application parts FLEXICON PART DESCRIPTION U M QTY EL00040 SOLENOID VALVE NEMA 4 1 COIL 110V 3 8 NPT 4 WAY EACH 1 PN00852 VALVE FLOW CONTROL 3 8 NPT EACH 4 PN00929 CYLINDER AIR 4...