9
Section 3 - Pre-Installation Checks and Options
3.1 Checklist
•
Check the model and size of the impact bed. Is it the right one for your beltline?
•
Check the bed to be sure all the parts are included in the shipment.
•
Find the Information Packet in the shipment.
•
Review the “Tools Needed” section on the front of the installation instructions.
•
Prepare the conveyor site:
- Lift the belt in the transfer zone. Use a lifting hoist or Flexco’s Belt Lifters.
- Remove the old impact bed or impact idlers.
- Inspect the conveyor structure for damage or misalignment. Make adjustments as necessary.
- Troughing idlers should be installed directly before and after the new impact bed.
Содержание DRX3000
Страница 1: ...www flexco com www flexco com DRX3000 Installation Operation and Maintenance Manual ...
Страница 26: ......